Jersey Valley Geothermal Development Project<br />

<strong>Environmental</strong> Assessment: NV063 -EAO8-09 1<br />

3.7.2 <strong>Environmental</strong> Consequences<br />

3.7.2.1 Proposed Action<br />

The potential for erosion within the Jersey Valley Unit Area is slight to moderate. The potential<br />

for erosion within the the transmission line corridor is moderate to high.<br />

Surface disturbance <strong>and</strong> vegetation removal during construction <strong>of</strong> proposed project facilities<br />

within the Jersey Valley Unit Area <strong>and</strong> transmission line corridor would increase the potential<br />

for erosion through exposure <strong>of</strong> denuded surfaces. Based on implementation <strong>of</strong> environmental<br />

protection measures specified by Ormat, water would be applied to the ground during<br />

construction as necessary to control dust (see Section 2.1.11). Each <strong>of</strong> the well pads, access roads<br />

<strong>and</strong> the power plant site would be surfaced with aggregate which would minimize dust <strong>and</strong><br />

stabilize erosive soils. Additionally, disturbed areas would be reclaimed in accordance with<br />

applicable BLM requirements (see Section 2.1.10).<br />

An NDEP-BAPC Surface Area Disturbance Permit, documenting the areas <strong>of</strong> proposed<br />

disturbance <strong>and</strong> the best practical dust control methods to be use, will be required for activities<br />

conducted within the Jersey Valley Unit Area <strong>and</strong> transmission line corridor because the surface<br />

disturbed within each area would be greater than 5 acres (see Section 3.2). Implementation <strong>of</strong> the<br />

applicable best practical dust control methods, through compliance with the Surface Area<br />

Disturbance Permit, would minimize fugitive dust emissions <strong>and</strong> soil erosion from wind <strong>and</strong><br />

water during construction, operation <strong>and</strong> decommissioning <strong>of</strong> the proposed Project.<br />

3.7.2.2 Alternative 1<br />

The construction, operation <strong>and</strong> maintenance <strong>of</strong> Alternative 1 would differ from the Proposed<br />

Action only by the small increase (0.25 acre) in the total permanent surface disturbance. The<br />

impacts <strong>of</strong> Alternative 1 to soils would not be different from that <strong>of</strong> the Proposed Action.<br />

3.8 VEGETATION<br />

3.8.1 Affected Environment<br />

Differences in the kind <strong>of</strong> vegetation are closely related to the kind <strong>of</strong> soil. Soils within the<br />

Jersey Valley Unit Area <strong>and</strong> the transmission line corridor were mapped by the USDA, Natural<br />

Resource Conservation Service (NRCS) in the <strong>L<strong>and</strong></strong>er County, North Part, soil survey <strong>and</strong> the<br />

Pershing County, East Part, soils survey (see Section 3.7.1). Vegetation communities mapped<br />

within the Jersey Valley Unit can be found in Figure 16 <strong>and</strong> Figure 17).<br />