Jersey Valley Geothermal Development Project<br />

<strong>Environmental</strong> Assessment: NV063-EAO8-091<br />

would be discharged to the atmosphere when the binary power plant unit is opened. These<br />

releases are estimated to average about 12 tons per year.<br />

Small quantities <strong>of</strong> typical <strong>of</strong>fice <strong>and</strong> industrial trash will be generated during power plant<br />

operations. Similar to construction wastes, the operations waste will be removed from the site by<br />

a local waste contractor <strong>and</strong> deposited in an <strong>of</strong>fsite disposal facility authorized to accept the<br />

wastes. Sanitary wastes will be h<strong>and</strong>led by a septic system constructed as part <strong>of</strong> the power plant<br />

facilities.<br />

Proper h<strong>and</strong>ling, storage <strong>and</strong> disposal <strong>of</strong> these hazardous materials, hazardous/regulated wastes<br />

<strong>and</strong> solid wastes in conformance with federal <strong>and</strong> state regulations would ensure that no soil,<br />

ground water, or surface water contamination would occur with any adverse effects on the<br />

environment or worker health <strong>and</strong> safety.<br />

The following mitigation measures are provided to help prevent contamination <strong>of</strong> soils <strong>and</strong><br />

reduce the potential for contamination <strong>of</strong> the reserve pit.<br />

Mitigation Measure:<br />

Absorbent pads or sheets would be placed under Likely spill sources.<br />

3.11.2.2 Alternative 1<br />

The impacts <strong>of</strong> Alternative 1 to Wastes (Hazardous <strong>and</strong> Solid) would not be different from that<br />

<strong>of</strong> the Proposed Action.<br />

3.12 RANGELAND<br />

3.12.1 Affected Environment<br />

The following is applicable within the Jersey Valley Unit Area (see Table 10):<br />

Table 10: Jersey Valley Unit Area Allotment Information<br />

Allotment Operator<br />

Season <strong>of</strong><br />

Use<br />

Use Area Kind’ AUMs<br />

<strong>L<strong>and</strong></strong> Status<br />

(acres)<br />

Buffalo<br />

Valley<br />

Goemmer L&L<br />

Buffalo Ranch, LLC<br />

7/16-9/15<br />

4/15-5/15<br />

5/1-7/15<br />

Jersey Valley LO<br />

Jersey Valley LO<br />

Jersey Valley HI<br />

C<br />

C<br />

C<br />

159<br />

20<br />

222<br />

Public: 137,150<br />

Private: 2.730<br />

South Goemmer L&L 7/16-9/15 Jersey Valley LO C 903 Public: 233,654<br />

Buffalo Buffalo Ranch, LLC 4/15-5/15 Jersey Valley LO C 116 Private: 12,039<br />

Jersey Jersey Valley Cattle 5/1-7/3 1 2<br />

N/A C 932 Public: 66,711<br />

Valley Co., LLC 8/1-1 1/30 2<br />

N/A C 914 Private: 1,612<br />

1. CattleC<br />

2. Jersey Valley Allotment alternates use every other year. (i.e. Year 1<br />

Year 2 allotment is used 8/1-11/30)<br />

allotment is used 5/1-7/3 1;<br />

- 75 -