27.12.2012 Views

Bureau of Land Management's Decision Record and Environmental

Bureau of Land Management's Decision Record and Environmental

Bureau of Land Management's Decision Record and Environmental

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ormat Nevada, Inc.<br />

Jersey Valley Geothermal Development Project<br />

<strong>Environmental</strong> Assessment<br />

Table <strong>of</strong> Contents<br />

INTRODUCTION 1<br />

1.1 Background 1<br />

1.2 Location <strong>and</strong> Summary <strong>of</strong> Proposed Action 1<br />

1.3 Purpose <strong>and</strong>Need 2<br />

1.4 <strong>L<strong>and</strong></strong> Use Plan Conformance 3<br />

1.5 Relationship to Laws, Regulations <strong>and</strong> Other Plans 4<br />

1.6 Identified Issues 5<br />

2 PROPOSED ACTION AND ALTERNATIVES 9<br />

2.1 Proposed Action 9<br />

2.1.1 ThePowerPlant 9<br />

2.1.1 .1 Operation <strong>and</strong> Maintenance Procedures 9<br />

2.1.1.2 Construction Procedures <strong>and</strong> Surface<br />

Disturbance 10<br />

2.1.2 Wells, Weilfields, Well Maintenance <strong>and</strong> Other<br />

Ancillary Facilities 11<br />

2.1.2.1 Well Drilling <strong>and</strong> Testing 12<br />

2.1.2.2 WellOperations 14<br />

2.1.3 Geothermal Pipelines 14<br />

2.1.3.1 Operation <strong>and</strong> Maintenance Procedures <strong>of</strong><br />

Pipeline 14<br />

2.1.4 Rights-<strong>of</strong>-Way for the Power Line <strong>and</strong> Access Road 15<br />

2.1.5 Transmission Line Corridor 15<br />

2.1.5.1 Facility Design Factors <strong>and</strong> Additional<br />

Components 15<br />

2.1.6 Site Access <strong>and</strong> Road Construction 16<br />

2.1.6.1 Construction Procedures <strong>and</strong> Surface<br />

Disturbance <strong>of</strong> the Transmission Line 17<br />

2.1.6.2 Construction Procedures <strong>and</strong> Surface<br />

Disturbance for the Pipelines <strong>and</strong> Well Fields 17<br />

2.1.6.3 Operation <strong>and</strong> Maintenance Procedures for the<br />

Transmission Line 18<br />

2.1.7 Water Requirements <strong>and</strong> Source 19<br />

2.1.8 Aggregate Requirements <strong>and</strong> Source(s) 19<br />

2.1.9 WorkForce <strong>and</strong> Schedule 19<br />

2.1.10 Project Decommissioning <strong>and</strong> Site Reclamation 20<br />

2.1.11 Adopted <strong>Environmental</strong> Protection Measures 21<br />

2.2 Alternatives 22<br />

2.2.1 Alternative 1 22<br />

2.3 Surface Disturbance Summary 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!