The BLM MLFO has determined that installation, construction, <strong>and</strong> operation <strong>of</strong> the Jersey<br />

Valley Geothermal Plant would not result in significant impacts to the environment <strong>and</strong> an<br />

<strong>Environmental</strong> Impact Statement (EIS) is not required based on the <strong>Environmental</strong> Assessment<br />

(EA) DOI-BLM-NV-063-EAO8-091(Attachment B) <strong>and</strong> Finding <strong>of</strong> No Significant Impact<br />

(FONSI) (Attachment C).<br />

Therefore, it is my decision to:<br />

1. Approve Ormat Nevada Inc. Utilization Plan <strong>and</strong> Operations Plan for the Jersey<br />

Valley Geothermal Project with the required conditions <strong>of</strong> approval specified in<br />

Attachment E.<br />

We received Ormat’s Utilization Plan to construct, operate <strong>and</strong> maintain the Jersey Valley<br />

Geothermal Development Project (Jersey Valley Project) in March 2010. The Project includes<br />

the construction <strong>and</strong> operation <strong>of</strong> a geothermal power generating facility, geothermal well fields,<br />

geothermal production <strong>and</strong> injection pipelines, access roads <strong>and</strong> ancillary support facilities<br />

(Attachment A <strong>and</strong> B).<br />

The Jersey Valley geothermal project is located within the Jersey Valley geothermal unit, <strong>and</strong><br />

encompasses approximately 8,470 acres <strong>of</strong> public <strong>and</strong> private l<strong>and</strong>s in Sections 15-16, 20-22, 27-<br />

29 <strong>and</strong> 32-34, Township 27 North, Range 40 east (T.27N. R.40E.), Mount Diablo Baseline <strong>and</strong>,<br />

Meridian (MDB&M), <strong>and</strong> the entirety <strong>of</strong> Section 3 <strong>and</strong> portions <strong>of</strong> Sections 4 <strong>and</strong> 5, T.26N.<br />

R.40E., MDB&M (Attachment A).<br />

The regulations, 43 CFR 3270 through 3279 cover the permitting <strong>and</strong> operating procedures for<br />

the utilization <strong>of</strong> geothermal resources.<br />

2. Approve the issuance <strong>of</strong> the Site License, Commercial Use Permit <strong>and</strong> Construction<br />

Permit for the Ormat Nevada Inc. Jersey Valley Geothermal Project.<br />

BLM received the Site License application for the Jersey Valley geothermal power plant from<br />

Ormat on April 28, 2010. Enclosed in the application were the site plan drawing <strong>and</strong> legal<br />

description for the proposed power plant. The regulation, 43 CFR 3273 provides direction <strong>and</strong><br />

guidance for Site License. -<br />

The Commercial Use Permit has not been received <strong>and</strong> must be submitted <strong>and</strong> approved prior to<br />

the commencement <strong>of</strong> operation <strong>of</strong> the GEOT power plant. The regulations at, 43 CFR 3274<br />

provides direction <strong>and</strong> guidance for the Commercial Use Permit submission.<br />

The Construction Permit was submitted on May 14, 2010 <strong>and</strong> is approved in accordance with 43<br />