Jersey Valley Geothermal Development Project<br />

<strong>Environmental</strong> Assessment: NV063-EAO8-091<br />

The Jersey Valley Project is located within the Jersey Valley geothermal unit, <strong>and</strong> encompasses<br />

approximately 8,470 acres <strong>of</strong> public <strong>and</strong> private l<strong>and</strong>s in Sections 15-16, 20-22, 27-29 <strong>and</strong> 32-34,<br />

Township 27 North, Range 40 east (T.27N. R.40E.), Mount Diablo Baseline <strong>and</strong> Meridian<br />

(MDB&M), <strong>and</strong> the entirety <strong>of</strong> Section 3 <strong>and</strong> portions <strong>of</strong> Sections 4 <strong>and</strong> 5, T.26N. R.40E.,<br />

MDB&M (see Figure 2).<br />

The Proposed Action also includes the construction <strong>and</strong> operation <strong>of</strong> an approximately<br />

27.59-mile overhead electrical transmission line originating at the proposed Jersey Valley power<br />

plant <strong>and</strong> terminating at the proposed SPPCo. substation (see Figure 3). Table 1 shows what has<br />

been submitted to the BLM on behalf <strong>of</strong> the Project.<br />

Table 1: Project Submittals<br />

Operations Plan 1 Utilization Plan 2 ROW/PoD 3<br />

Original Revised Original Revised Original Revised<br />

Jersey Valley April 2009 March 2010 April 2009 April 2010 n’a n/a<br />

Transmission<br />

Line<br />

n/a n/a n/a nla April 2009 April 2010<br />

New Road nla n/a n/a n/a March 2010 April 2010<br />

I For approval to drill <strong>and</strong> test those geothermal wells located on public i<strong>and</strong>s managed by the BLM which would be used for<br />

production <strong>and</strong> injection <strong>of</strong> geothermal fluid for the Project.<br />

2 For approval <strong>of</strong> the utilization facilities (i.e. power plant, pipelines, etc.) located on public l<strong>and</strong>s managed by the BLM.<br />

3 For those portions <strong>of</strong> the transmission line corridor <strong>and</strong> the new road located on public l<strong>and</strong>s managed by the BLM.<br />

1.3 PURPOSE AND NEED<br />

Background<br />

Ormat’s purpose <strong>of</strong> the Project is to commercially develop the geothermal resources within the<br />

federal geothermal unit; to construct <strong>and</strong> operate a commercial geothermal power plant <strong>and</strong><br />

weilfield within the unit; <strong>and</strong> to transport generated electricity from the Project to a power<br />

purchaser in compliance with the Nevada State m<strong>and</strong>ated Renewable Portfolio St<strong>and</strong>ard. The<br />

purpose <strong>of</strong> the Project’s transmission line <strong>and</strong> electrical substation is to provide the electrical<br />

interconnection with the existing SPPCo./Nevada Energy (NVE) electrical transmission system<br />

at the proposed junction in an economically viable manner which minimizes transmission line<br />

energy losses <strong>and</strong> adverse environmental impacts. Ormat needs to be able to produce geothermal<br />

resources in commercial quantities from the Unit or the federal geothermal leases will terminate.<br />

Agency’s Purpose <strong>and</strong> Need<br />

Under the Federal <strong>L<strong>and</strong></strong> Policy <strong>and</strong> Management Act <strong>of</strong> 1976 <strong>and</strong> its implementing regulations,<br />

including 43 CFR 2800, BLM must respond to Ormat’s ROW applications. Under the terms <strong>of</strong><br />

the Geothermal Steam Act, its revisions <strong>of</strong> 2007, <strong>and</strong> it’s implementing regulations; <strong>and</strong> the<br />

Programmatic Geothermal <strong>Environmental</strong> Impact Statement <strong>and</strong> its <strong>Record</strong> <strong>of</strong> <strong>Decision</strong> <strong>of</strong><br />

December, 2008. BLM must respond to the proposed plans, applications <strong>and</strong> programs submitted<br />