24.11.2023 Views

COP_2023_V7_pages

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14.15.2 Operation Assessed. Once all risks are reduced to a tolerable ALARP level, then the MASS operation can be<br />

considered as assessed. Gaps should then be known, and mitigation actions listed for completion, which should<br />

consist of outstanding training requirements.<br />

14.15.3 Training Matrix. The items listed on the potential operators current training levels, and any training identified to<br />

fill operational gaps identified during the process, can make up the operators’ training matrix and used in future<br />

for similar operations.<br />

14.15.4 Continuous Development. As outlined earlier, the use of data and statistics of similar operations can help<br />

produce the most accurate risk assessment. However, data may be initially limited. Therefore, the assessment<br />

must be continuously monitored for its effectiveness. It is recommended that a full review is conducted at an<br />

appropriate interval to ensure that the training requirements remain relevant to the operation, and the risks<br />

remain ALARP. A Closed Loop Safety Assessment flow diagram is shown at Figure 14-3.<br />

Figure 14-3: Closed Loop Safety Assessment<br />

YES<br />

Continuously<br />

Identify &<br />

Quantify Risks<br />

YES<br />

Was Action<br />

Effective?<br />

Are Risks<br />

Acceptable?<br />

NO<br />

NO<br />

Take Remedial<br />

Action<br />

14.16 MARITIME AUTONOMOUS INFRASTRUCTURE<br />

14.16.1 As the levels of the MASS autonomy change within the mission, the location of the MASS operator may well<br />

change from one RCC to another RCC. Operators operating or monitoring from any RCC should have complete<br />

understanding of the mission, as well as any specific tasks that may be required from them.<br />

14.16.2 Emergency scenarios and test procedure drills should be devised and practiced at regular intervals. These<br />

drills are to be recorded in the Operators Record Book. (See Annex B). It is recommended that, where appropriate,<br />

cloud based or digital systems should be adopted.<br />

14.16.3 New MASS operator skill sets will evolve and need to be assessed and, where appropriate incorporated into<br />

the training requirements of MASS operators.<br />

MASS UK Industry Conduct Principles and Code of Practice Version 7<br />

113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!