WIC EBT Feasibility Study and Cost‐Benefit Analysis
WIC EBT Feasibility Study and Cost‐Benefit Analysis
WIC EBT Feasibility Study and Cost‐Benefit Analysis
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Virginia Department of Health <strong>WIC</strong> <strong>EBT</strong> <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> Cost-Benefit <strong>Analysis</strong><br />
Retailer Management: The State does not intend to provide or maintain st<strong>and</strong>-beside POS<br />
terminals. Instead, it will provide some level of subsidies to retailers; the hardware <strong>and</strong> software<br />
purchased with these subsidies generally come with a warranty; as with Texas, once the subsidy<br />
is given, retailers will manage their own equipment.<br />
Client Help Desk Support: For client support, the State intends to follow the same processes as<br />
the paper based system, requesting the clients return to the local clinic if support is required for<br />
their cards or benefits. The State will require either the e-<strong>WIC</strong> or the SAM system, depending<br />
on final design, to provide web-based client support. These steps are anticipated to minimize the<br />
requirements for a client help desk. The State is assuming, however, that it may need to increase<br />
its current help desk staff by one FTE if the system is brought in-house.<br />
Retailer <strong>and</strong> Clinic Help Desk Support: The State anticipates that the current help desk<br />
operators <strong>and</strong> retailer liaisons will provide the necessary help desk support in the e-<strong>WIC</strong><br />
environment.<br />
6.1.4 SITE<br />
State Level: If the system is taken in-house, VDH will need to house the servers at the VITA<br />
facility. There are no other facility changes anticipated at the State level.<br />
Local Level: The only changes anticipated at the local level are the slight modifications<br />
necessary to install POS terminals in the <strong>WIC</strong> clinic waiting areas.<br />
6.1.5 FISCAL<br />
The in-house system will require an up-front investment in hardware, software <strong>and</strong> services,<br />
including a significant investment in retailer support <strong>and</strong> retailer infrastructure. However, it is<br />
seen to provide a significant savings in operations costs, becoming cost-neutral within six years<br />
of operations.<br />
33 V 1.2 August 20, 2008