06.02.2013 Views

$95 HD/LINKer - Invensys Rail

$95 HD/LINKer - Invensys Rail

$95 HD/LINKer - Invensys Rail

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Document No.: SIG-00-97-08 Version: C<br />

APPENDIX D<br />

<strong>HD</strong>/LINK WIRING LIST<br />

D-1<br />

<strong>HD</strong>/LINK WIRING LIST<br />

This appendix contains the <strong>HD</strong>/LINK Wiring List for the Upland 103 Group shown in figure A-1.<br />

The MCF Manager Display for this Group is shown in figure A-2. The <strong>HD</strong>/LINK Wiring List for this<br />

Group consists of a single sheet.<br />

At the top of this sheet is listed the Line and Group names followed by two columns of data. The<br />

first column lists all pertinent designation data relative to the Group itself. The second column<br />

lists all pertinent data relative to the Group’s Module Configuration File (MCF). This column also<br />

lists the File Cyclic Redundancy Code (CRC) value generated when the validation tests pass.<br />

The main body of the List contains information on how to wire the associated <strong>HD</strong>/LINK module.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!