The MOP authorized the provisional placement into<br />

service set forth in article 1.9.2.7 of the Bidding Terms and<br />

Conditions, once the Concession-holding Company had<br />

furnished the guarantee of operation, previously approved<br />

by the State Inspector.<br />

The Concession-holding Company must furnish an<br />

additional guarantee of operation to insure compliance<br />

with the conditions in which the State will receive the<br />

Concession, as set forth in article 1.11.3 of the Bidding<br />

Terms and Conditions. This guarantee must be delivered 24<br />

months before the expiry of the Contract through ten equal<br />

payable on demand bank performance bonds issued in<br />

<strong>San</strong>tiago, Chile by a local bank to the General Director of<br />

Public Works, for a total of UF 55,000 (fifty five thousand<br />

Unidades de Fomento). This additional guarantee will be<br />

valid for 3 years.<br />

All of the operating performance bonds must be payable on<br />

demand.<br />

The bank performance bonds will be returned within 15<br />

days after the State Inspector certifies that the Concessionholding<br />

Company has discharged all of the obligations<br />

undertaken with the MOP.<br />

The additional performance bond will be returned by the<br />

MOP within 15 days after its expiry date.<br />

25.3 Supplementary Agreements<br />

a) Supplementary Agreement No. 1<br />

Supreme Decree 508 of the Ministry of Public Works,<br />

dated July 30, 2007, published on the Official Gazette on<br />

November 12, 2007, approved Supplementary Agreement<br />

1, which amended the “Concesión Variante Vespucio – El<br />

Salto – Kennedy”. public works concession contract. The<br />

main aspects of this contract are the following:<br />

The modifications to the layout, design, works and services<br />

set forth in this contract were as follows:<br />

1. Sociedad Concesionaria <strong>Túnel</strong> <strong>San</strong> <strong>Cristóbal</strong> S.A. had<br />

to modify and improve the works of the northern sector<br />

of the works under concession and of Avenida Américo<br />

Vespucio, by performing the engineering survey and other<br />

surveys required to modify the layout of the tunnels and<br />

their accesses in the northern sector of the works and<br />

execute the works of the so-called “Alternativa Pirámide”.<br />

The Concession-holding Company was responsible for and<br />

assumed all of the construction, geological and natural risks<br />

of the so-called “Alternativa La Pirámide”, as well as all of<br />

the obligations set forth in the Bidding Terms and Conditions<br />

for the Reference Project which were extended to include<br />

that alternative.<br />

2. The layout of the works under concession was modified,<br />

in the following areas of the Acceso El Salto section: Zones<br />

1 and 2 of the original Engineering Reference Project (PRI),<br />

which are defined in Table 1 of article 1.8.7.2.1 of the<br />

Bidding Terms and Conditions.<br />

3. The Concession area was expressly modified, being<br />

applied to the PRI layout, which is maintained, and to<br />

the New Concession Layout, and ratifying what is stated<br />

in definition 4 of article 1.2.3 of the Bidding Terms and<br />

Conditions, that is, anything that is required to execute the<br />

works and to render the services defined in the Concession<br />

Contract which are to be located on State-owned property<br />

for public or government use.<br />

4. As a consequence of the foregoing and of the agreements<br />

reached herein, the PRI works of the northern area of the<br />

concession that are withdrawn, were excluded from the<br />

concession contract, therefore the Concession-holding<br />

Company was released from having to fulfill any and all<br />

obligations related to those works.<br />