Start-minute maximum intensity of<br />

daily rainfall for the period of 50 years in<br />

the period of 30 minutes is 4.12 mm / min,<br />

and medium intensity rainfall in the period<br />

of 8 hours, authoritative for the calculation<br />

of normal flow caused by atmospheric<br />

precipitation is 0.08 mm / min.<br />

Maximum daily amount of surface water<br />

caused by atmospheric precipitation,<br />

which is released into the open pit is<br />

14 000 m 3 . The amount of atmospheric<br />

water caused by rainfall that reaches the<br />

prospect of normal inflows is 735 m 3 .<br />

Maximum inflow of ground water is<br />

estimated at 500 l/s. Normal influx of<br />

ground water is 40 l/s.<br />

Maximum daily inflow of underground<br />

water is during the extreme rainfalls and is<br />

43 200 m 3 . Normal daily inflow of underground<br />

water is 3 450 m 3 .<br />

Total maximum inflow into the pit of<br />

surface and ground water is considered as<br />

the relevant for dimensioning the pumping<br />

plant at the open pit, amounts to 57 200 m 3 .<br />

SYSTEM FOR WATER PUMPING<br />

At the open pit “Potrlica“ , two types<br />

of pump, manufactured by “Jastrebac”<br />

from Niš are in operation:<br />

• Pipe pumps BP 300 – 1 engine<br />

power 132 kW, and<br />

• Centrifugal pumps VPN 251 – 3 engine<br />

power 475 kW.<br />

System for water pumping is the following<br />

[2]:<br />

• The temporary water sump is located<br />

at the lowest bench of open pit with<br />

2 pumps, type<br />

• BP 300 – 1. Water is pumped from<br />

bench level K+632 m, pipeline<br />

length is 50 m.<br />

• The water from auxiliary water sump<br />

is pumped into the main water sump<br />

at level K+643 m, where 4 pumps,<br />

type BP 300 – 1, are located.<br />

• From the main water sump, the water<br />

is pumped through pipeline, length<br />

160 m to the level K+656 m where 4<br />

pumps, type VPN 251 – 3, are installed.<br />

The pumps BP – 300 – 1 and<br />

VPN 251 – 3 are directly connected<br />

with pipeline.<br />

• From the level of K +656 m, the water<br />

is pumped to the water sump at<br />

level +758 K m, by pipeline of 970<br />

m length.<br />

One section of pumps for water pumping<br />

from the main water sump to the settling<br />

tank are connected by a serial BP 300-<br />

1 pump and VPN 251 – 3 pump. Such four<br />

section are in operation at the open pit.<br />

Figures 1 and show the line diagram of<br />

drainage system and spatial position of<br />

pump facilities, and Figure 3 shows the<br />

operation diagram of one section.<br />

Operation points of pumps at auxiliary<br />

and section on the main water sump are<br />

given in Table 2.<br />

No 1,2010. 99<br />