The average rate of electricity yield for<br />

water pumping water at the open pit “Potrlica”<br />

is 1.02 kW/m 3 of pumped water.<br />

CONCLUSION<br />

Water inflows into the open pit “Potrlica”<br />

are extremely high. The highest influx<br />

of groundwater flow into the open pit<br />

can not be stopped, so it has to be<br />

pumped. The existing system for water<br />

pumping at the open pit “Potrlica” has<br />

successfully pumped water that got into<br />

the mine area.<br />

With development of mining works<br />

per plan and depth, higher inflows could<br />

be expected than the existing ones. According<br />

to the dynamics of development<br />

work for the next five years, the water<br />

sump would remain at the current level,<br />

while the auxiliary water sump would be<br />

lowered to the level K+600 m.<br />

Therefore, it is necessary in the future<br />

to purchase another BP 300-1 pump and a<br />

pump VPN 251-3 for the main water sump<br />

as well as two pumps type BP 300-1 for<br />

auxiliary water sump.<br />

REFERENCES<br />

[1] Study on Classification, Categori<strong>za</strong>tion<br />

and Calculation of Coal Reserves in<br />

the Potrlica Deposit, Coal Mine<br />

Pljevlja, 2006 (in Serbian)<br />

[2] Additional Mining Project of Coal<br />

Mining at the Open Pit Potrlica -<br />

Pljevlja for the Period 2010-2014,<br />

Mining and Metallurgy <strong>Institut</strong>e <strong>Bor</strong>,<br />

2010 (in Serbian)<br />

No 1,2010. 102<br />

MINING ENGINEERING