24.02.2013 Views

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3 shows the mutual position of<br />

open pits in the exploitation field Cerovo –<br />

Kraku Bugaresku.<br />

Table 1 shows the turning points of exploitation<br />

field Cerovo – Kraku Bugaresku<br />

in the rectangular coordinate system<br />

Figure 1. Open Pit Kraku Bugaresku –Cementacija 1 that is expanded<br />

Figure 2. Leaching water from the open pit C1<br />

Table 1 shows the turning points of<br />

exploitation field Cerovo – Kraku Bugare<br />

sku in the rectangular coordinate system<br />

Table 1 Coordinates of tops of the exploitation field Cerovo – Kraku Bugaresku<br />

Ord.No. POINT No. X Y<br />

1 1 7 582 775.0 4 890 350.0<br />

2 2 7 581 050.0 4 892 750.0<br />

3 3 7 581 010.0 4 892 790.0<br />

4 4 7 582 220.0 4 895 030.0<br />

5 5 7 584 820.0 4 894 490.0<br />

6 6 7 585 570.0 4 890 020.0<br />

No 1,2010. 122<br />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!