Institut za rudarstvo i metalurgiju Bor
Institut za rudarstvo i metalurgiju Bor
Institut za rudarstvo i metalurgiju Bor
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 3 shows the mutual position of<br />
open pits in the exploitation field Cerovo –<br />
Kraku Bugaresku.<br />
Table 1 shows the turning points of exploitation<br />
field Cerovo – Kraku Bugaresku<br />
in the rectangular coordinate system<br />
Figure 1. Open Pit Kraku Bugaresku –Cementacija 1 that is expanded<br />
Figure 2. Leaching water from the open pit C1<br />
Table 1 shows the turning points of<br />
exploitation field Cerovo – Kraku Bugare<br />
sku in the rectangular coordinate system<br />
Table 1 Coordinates of tops of the exploitation field Cerovo – Kraku Bugaresku<br />
Ord.No. POINT No. X Y<br />
1 1 7 582 775.0 4 890 350.0<br />
2 2 7 581 050.0 4 892 750.0<br />
3 3 7 581 010.0 4 892 790.0<br />
4 4 7 582 220.0 4 895 030.0<br />
5 5 7 584 820.0 4 894 490.0<br />
6 6 7 585 570.0 4 890 020.0<br />
No 1,2010. 122<br />
MINING ENGINEERING