24.02.2013 Views

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

Institut za rudarstvo i metalurgiju Bor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

krečnjak, 37.0%<br />

bakar, 1.9%<br />

nikl, 1.9%<br />

granit, 1.9%<br />

Mineralna sirovina <strong>za</strong> tehnološku probu<br />

peščar, 1.9%<br />

ugalj, 1.9%<br />

mermer, 9.3%<br />

dolomit, 7.4%<br />

feldspat, 1.9%<br />

bigar, 1.9%<br />

treset, 1.9%<br />

traventin, 1.9%<br />

Figure 2. Mineral raw material for technological sample<br />

It could be seen from diagram that the<br />

lime as mineral raw material is the most<br />

present in the approved SMP for taking<br />

the technological samples, then marble,<br />

dolomite, diabase and other raw materials.<br />

The share of metal ores in percentage distribution<br />

of raw materials is, as it could be<br />

seen, insignificant in comparison to the<br />

non-metals.<br />

Determining the quality of mineral raw<br />

materials in deposit, that is the ore body,<br />

is determined by sampling and prescribed<br />

by the Regulation on classification and<br />

categori<strong>za</strong>tion of reserves the solid mineral<br />

raw materials and keeping records of them<br />

(“Official Gazette of SFRY” No. 53/79).<br />

Quantity of mineral raw materials, are<br />

dijabaz, 5.6%<br />

andezit, 5.6%<br />

dacit, 3.7%<br />

pesak, 3.7%<br />

glina, 3.7%<br />

olovo i cink, 3.7%<br />

tuf, 3.7%<br />

not clearly defined in this Regulation<br />

rules, except for architectural-construction<br />

stone. Due to this reason, MME have<br />

brought an act that clearly prescribed and<br />

adjusted amounts of mineral raw materials<br />

that can be exploited for the purpose of<br />

taking samples for technological investigations<br />

(Table 1).<br />

Therefore, quantity of material that can<br />

be taken as a technological sample should be<br />

determined in accordance with these terms.<br />

For the following method, after realized<br />

mining works, there is no need for land reclamation<br />

on surface where the sample was<br />

taken, as well as land restoring to the original<br />

purpose, what were the main reasons for<br />

enactment of this Act by the Ministry.<br />

No 1,2010. 10<br />

MINING ENGINEERING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!