Figure 3. Operation diagram of pumps at the open pit “Potrlica”<br />

Table 2. Operation point of pumps at the open pit “Potrlica<br />

Pump Water sump H, m Qunit, l/s Pcs. Qmax, l/s<br />

BP-300-1 PVS 15 420 2 840<br />

(BP-300-1 + VPN 251-3)/r GVS 160 180 4 720<br />

Total maximum inflow into the open<br />

pit of surface and ground water is:<br />

Qv = 57 200 m 3 . Total capacity of pumping<br />

plants is shown in Table 2. For pumping<br />

the maximum inflows, the simultaneous<br />

operation of both pumps is needed at<br />

auxiliary water sump and both pump sections<br />

on the main water sump.<br />

The required pumping time of water from<br />

maximum inflow from the auxiliary water<br />

sump at level +634 K into the main water<br />

sump at level K-level +649 m, and from the<br />

main water sump into the settling tank at level<br />

+754 K m, is 19 and 22 hours successively.<br />

Pumping plants are sized for maximum<br />

water inflows. Electricity consumption<br />

per year is determined by the average<br />

annual amount of water that is pumped -<br />

10 680 000 m 3 .<br />

Number of moto – operation hours of<br />

pump BP-300-1 at the auxiliary water<br />

sump is 7063 h/year. Number of moto -<br />

hours of section operation at the main water<br />

sump is vodosabirniku 16 481 h / year.<br />

Total average consumption of electricity<br />

for water pumping from the open pit<br />

“Potrlica” 10 936 283 kWh / year.<br />