COMMITTEE OF UNDERGROUND EXPLOITATION OF YU ISSN: 1451-0162<br />

THE MINERAL DEPOSITS UDK: 622<br />

UDK: 622.271(045)=20<br />

Radmilo Rajković*, Daniel Kržanović*, Dejan Mitić*<br />

QUANTITY OF WATER AND PUMP SYSTEM FOR DRAINAGE AT<br />

THE OPEN PIT OF THE COAL MINE “POTRLICA“ – PLJEVLJA<br />

Abstract<br />

This work shows the effect parameters and quantity of water at the coal open pit mine „Potrlica“<br />

within the Pljevlja Coal Basin. The system of water pumping at the open pit was shown and<br />

its verification was made.<br />

Key words: pump system, water quantity, verification<br />

INTRODUCTION<br />

The coal open pit “Potrlica“ is within<br />

the Pljevlja Coal Basin.<br />

The size of water quantity is under the<br />

largest impact of surface water caused by<br />

the atmospheric precipitation that falls directly<br />

on the area of open pit, the surface<br />

water due to the atmospheric precipitation<br />

from the catchment area from which gravitate<br />

towards the pit and underground water.<br />

The biggest influx in the area of the open<br />

pit is by the groundwater and ranges from 40<br />

and up to 500 l / s. For the area of Pljevlja, the<br />

initial intensity of maximum fifty-year rainfall<br />

is 4.12 mm/min. Maximum quantity of<br />

groundwater and surface water for eight hours<br />

can reach the open pti is 57 000 m 3 .<br />

The average amount of pumped water<br />

from 1991 to 2008. was 10 680 000 m 3 /year.<br />

The system of well and centrifugal<br />

pumps is predicted for water pumping, set<br />

at three locations. Total power system is 2<br />

692 kW. Total geodetic lifting height is<br />

114 m, and maximum water flow through<br />

system is 720 l / s.<br />

* Mining and Metallurgy <strong>Institut</strong>e, <strong>Bor</strong><br />

REVIEW AND ANALYSIS OF IN-<br />

FLUENTIAL PARAMETERS<br />

The rainfalls have a continental type of<br />

distribution, maximum in late spring, the<br />

secondary maximum in late autumn and<br />

minimum during the winter. The annual<br />

amount of sediment is 800-1 100 mm and is<br />

one of the lowest in Montenegro. The annual<br />

distribution of monthly rainfalls is uniform.<br />

The average number of days with rainfalls is<br />

144 per year. Number of days per year with<br />

snow cover >1 cm is 67, and height >10 cm<br />

is 32. Snowfalls usually start in mid-<br />

November and ends in mid-April [1].<br />

In the area of coal deposits Potrlica there<br />

are three types of aquifers: compact type,<br />

fracture type and karst type of aquifers [1].<br />

Compact type of groundwater is<br />

formed in the alluvial coat of the river<br />

Ćehotina and dumped waste masses in the<br />

space of inner and outer waste dumps of<br />

the open pit “Potrlica”. Aluvial sandypebbly<br />

sediments have area of 4 km 2 and<br />

the width of Ćehotina alluvion varies<br />

25-600 m. The groundwater level is in<br />

No 1,2010. 95<br />