03.03.2013 Views

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Issue 04 | 2010<br />

NEWS & REPORTS<br />

THE WINNING CHOICE OF THOSE<br />

WHO RELY ON MB!<br />

It is precisely in this period, when the construction<br />

market is still shaky <strong>and</strong> uncertain, that is clear how<br />

MB’s crusher buckets offer the best solution ever<br />

<strong>for</strong> those who use them: a solution that offers many<br />

advantages <strong>and</strong> allows companies to cut costs <strong>and</strong>,<br />

in the meantime, to save time <strong>and</strong> money.<br />

Firstly, MB’s crusher buckets guarantee practical<br />

use <strong>and</strong> reduced costs <strong>for</strong> material disposal,<br />

transport <strong>and</strong> supply <strong>and</strong> secondly, this product<br />

represents the typical investment aimed to boost<br />

the micro/macro economic cycle, now <strong>and</strong> in the<br />

future.<br />

For this reason, whoever chooses MB’s crusher<br />

buckets does it not only <strong>for</strong> work requirements but<br />

also because they are looking to upgrade their<br />

equipment fleet <strong>and</strong> achieve higher work quality, in<br />

full respect <strong>for</strong> the environment.<br />

We also should not underestimate the fact that the<br />

operating process of a crusher bucket is extremely<br />

simple. First of all, the material can be taken directly<br />

to a yard or to any other location. This is followed by a<br />

phase in which the material is prepared <strong>for</strong> the work<br />

cycle by means of grabs <strong>and</strong> jackhammers. This is<br />

how the loose material crushing process begins, the<br />

material having been previously picked up, hoisted,<br />

carried <strong>and</strong> unloaded by the same bucket, <strong>and</strong> lastly<br />

grounded at the desired thickness. The resulting<br />

material can be reused <strong>for</strong> other jobs at the same<br />

worksite or be taken to other worksites <strong>and</strong> used to<br />

build yards, road embankments, drainage systems<br />

<strong>and</strong> <strong>for</strong> filling in various excavations.<br />

www.advanced-mining.com<br />

107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!