03.03.2013 Views

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Also <strong>new</strong> in the 390D L‘s implement hydraulic circuits<br />

are electrically controlled regeneration valves, which<br />

assure rapid, positive response from the boom <strong>and</strong><br />

digging arm cylinders while also significantly improving<br />

overall hydraulic efficiency. The resulting benefits<br />

include quicker cycle times <strong>and</strong> estimated fuel savings<br />

of more than 2 percent.<br />

A universal quick-coupler circuit is available <strong>for</strong><br />

factory installation <strong>and</strong> is compatible with both dedicated<br />

<strong>and</strong> pin-grabber-type couplers. The system features an<br />

offset lifting eye <strong>and</strong> easy-to-use controls.<br />

Structures <strong>and</strong> undercarriage<br />

An improved undercarriage <strong>for</strong> the 390D L features<br />

redesigned links that operate with lower stress, <strong>for</strong>ged<br />

idlers <strong>for</strong> improved durability <strong>and</strong> heavy-duty track<br />

rollers <strong>and</strong> carrier rollers. In addition, the recoil spring<br />

has been lengthened, giving the recoil mechanism<br />

greater impact-absorbing capability to protect the<br />

undercarriage system from shock loads.<br />

To accommodate the higher digging <strong>and</strong> lifting <strong>for</strong>ces<br />

generated by the 390D L, the carbody (the structure<br />

mounting the machine upper to the track assemblies)<br />

is fabricated with thicker rein<strong>for</strong>cing plates at critical<br />

Issue 04 | 2010<br />

NEWS & REPORTS<br />

locations. Complementing this change are thicker plates<br />

at the boom-foot mounting in the upper frame as well as<br />

thicker rein<strong>for</strong>cing plates in the rails <strong>and</strong> bottom pan to<br />

accommodate the heavier counterweight.<br />

The counterweight weighs 12,4 tonnes, making it<br />

slightly more than 6 percent heavier than the 385C‘s<br />

counterweight.<br />

Booms <strong>and</strong> digging arms also are stronger, the result<br />

of thicker material used in their fabrication <strong>and</strong> an<br />

improved welding process. To assure continuous welds,<br />

with no craters at the start <strong>and</strong> stop of the weld pass that<br />

can induce stress, „runoff “ tabs are first tacked at each<br />

end of the seam between plates being joined. When the<br />

weld is made, it begins on the first runoff tab, continues<br />

across the seam, <strong>and</strong> ends on the second runoff tab. The<br />

runoff tabs are then removed, leaving a consistent weld<br />

bead across the seam. When completely fabricated,<br />

booms <strong>and</strong> digging arms are placed in a heat-treat oven<br />

to relieve any welding-induced stress.<br />

Operator com<strong>for</strong>t <strong>and</strong> convenience<br />

The 390D L‘s operator‘s station is spacious, quiet <strong>and</strong><br />

com<strong>for</strong>table with comm<strong>and</strong>ing visibility.<br />

www.advanced-mining.com<br />

143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!