A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Also <strong>new</strong> in the 390D L‘s implement hydraulic circuits<br />
are electrically controlled regeneration valves, which<br />
assure rapid, positive response from the boom <strong>and</strong><br />
digging arm cylinders while also significantly improving<br />
overall hydraulic efficiency. The resulting benefits<br />
include quicker cycle times <strong>and</strong> estimated fuel savings<br />
of more than 2 percent.<br />
A universal quick-coupler circuit is available <strong>for</strong><br />
factory installation <strong>and</strong> is compatible with both dedicated<br />
<strong>and</strong> pin-grabber-type couplers. The system features an<br />
offset lifting eye <strong>and</strong> easy-to-use controls.<br />
Structures <strong>and</strong> undercarriage<br />
An improved undercarriage <strong>for</strong> the 390D L features<br />
redesigned links that operate with lower stress, <strong>for</strong>ged<br />
idlers <strong>for</strong> improved durability <strong>and</strong> heavy-duty track<br />
rollers <strong>and</strong> carrier rollers. In addition, the recoil spring<br />
has been lengthened, giving the recoil mechanism<br />
greater impact-absorbing capability to protect the<br />
undercarriage system from shock loads.<br />
To accommodate the higher digging <strong>and</strong> lifting <strong>for</strong>ces<br />
generated by the 390D L, the carbody (the structure<br />
mounting the machine upper to the track assemblies)<br />
is fabricated with thicker rein<strong>for</strong>cing plates at critical<br />
Issue 04 | 2010<br />
NEWS & REPORTS<br />
locations. Complementing this change are thicker plates<br />
at the boom-foot mounting in the upper frame as well as<br />
thicker rein<strong>for</strong>cing plates in the rails <strong>and</strong> bottom pan to<br />
accommodate the heavier counterweight.<br />
The counterweight weighs 12,4 tonnes, making it<br />
slightly more than 6 percent heavier than the 385C‘s<br />
counterweight.<br />
Booms <strong>and</strong> digging arms also are stronger, the result<br />
of thicker material used in their fabrication <strong>and</strong> an<br />
improved welding process. To assure continuous welds,<br />
with no craters at the start <strong>and</strong> stop of the weld pass that<br />
can induce stress, „runoff “ tabs are first tacked at each<br />
end of the seam between plates being joined. When the<br />
weld is made, it begins on the first runoff tab, continues<br />
across the seam, <strong>and</strong> ends on the second runoff tab. The<br />
runoff tabs are then removed, leaving a consistent weld<br />
bead across the seam. When completely fabricated,<br />
booms <strong>and</strong> digging arms are placed in a heat-treat oven<br />
to relieve any welding-induced stress.<br />
Operator com<strong>for</strong>t <strong>and</strong> convenience<br />
The 390D L‘s operator‘s station is spacious, quiet <strong>and</strong><br />
com<strong>for</strong>table with comm<strong>and</strong>ing visibility.<br />
www.advanced-mining.com<br />
143