03.03.2013 Views

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

is to all intents <strong>and</strong> purposes sealed by the injection of<br />

the drill mud, whether the drillstring is in place or not. To<br />

this effect it is necessary to apply 1.5 times the calculated<br />

hydrostatic pressure as a test pressure, as governed by<br />

the depth reached at the <strong>drilling</strong> site.<br />

The relevant personnel are required to attend special<br />

training sessions (courses include ‘Principles of well<br />

control’) at the Celle Drilling School in order that the<br />

installed safety equipment can be deployed properly <strong>and</strong><br />

rapidly should an emergency arise.<br />

Exploration <strong>drilling</strong> programme at K+S<br />

KALI’s Zielitz potash mine<br />

The Zielitz potash mine is one of six sites in Germany<br />

where K+S KALI GmbH extracts potassium <strong>and</strong><br />

magnesium salts. These are used as feedstock <strong>for</strong> a<br />

large range of potash, magnesium <strong>and</strong> sulphur fertilisers<br />

<strong>and</strong> are also processed into products <strong>for</strong> technical,<br />

commercial <strong>and</strong> pharmaceutical applications.<br />

Zielitz started production in 1973 as the most recent<br />

addition to the K+S KALI group. The mine employs a<br />

work<strong>for</strong>ce of some 1,700, making it one of the largest<br />

employers in Saxony-Anhalt.<br />

For 25 years potash mining at this site has focused<br />

exclusively on the Zielitz 1 deposits. A roadway system<br />

is underway getting established since 1998 to get access<br />

to the mining concession Zielitz 2.<br />

Military activities on the Colbitz-Letzlinger heath<br />

have prevented this area of about 36 km² from being<br />

surveyed by sur<strong>face</strong> exploration <strong>drilling</strong> <strong>and</strong> geophysical<br />

measurements. All tunnel developments completed to<br />

date have been undertaken on the basis of <strong>and</strong> under<br />

the cover of underground exploration work.<br />

Issue 04 | 2010<br />

TRANSFER OF TECHNOLOGY<br />

In order to fill this gap in the exploration map <strong>and</strong><br />

provide back-up <strong>for</strong> its own survey activities K+S KALI<br />

GmbH commissioned Thyssen Schachtbau GmbH in<br />

early 2007 to carry out horizontal exploratory <strong>drilling</strong>s<br />

in the Zielitz 2 area of the mining concession. Starting<br />

out from a number of <strong>drilling</strong> chambers the team drilled<br />

a series of horizontal holes in two to four directions <strong>and</strong><br />

with a maximum length of 2,500 m.<br />

The aim was to identify the location of the Ronnenberg<br />

potash seam (K3RO) at predetermined intervals by using<br />

a <strong>drilling</strong> programme comprising undulating holes <strong>and</strong><br />

deviated holes.<br />

As the survey zone is located in an area of deposits<br />

that is prone to salt migration it was also necessary to<br />

explore the adjacent salt horizons in the roof <strong>and</strong> floor<br />

(barrier layer identification). The interim results from<br />

some 17,200 m of <strong>drilling</strong> were collated in October 2008<br />

<strong>and</strong> yielded 28 seam exposures <strong>and</strong> 26 barrier layer<br />

verifications.<br />

The exploration programme is being carried out using<br />

a universal <strong>drilling</strong> machine with an electro-hydraulic<br />

drive (type HBR 201, supplied by Hütte) <strong>and</strong> an electrically<br />

powered Triplex mud pump. The company has invested<br />

heavily in this <strong>new</strong> <strong>drilling</strong> system with its various<br />

attachments in order to ensure that the requirements<br />

profile is being met to the full.<br />

The drillers use the counterflush coring method with<br />

saturated salt flushing. This highly effective <strong>and</strong> cost<br />

efficient core <strong>drilling</strong> technique has already proved<br />

successful in horizontal exploration work where special<br />

per<strong>for</strong>mance requirements are involved. This system<br />

differs from the wireline coring method in that reverse<br />

mud flush circulation is used to facilitate uninterrupted<br />

Schematic diagram of<br />

borehole curvature<br />

www.advanced-mining.com<br />

96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!