A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ko M a t s U<br />
Issue 04 | 2010<br />
NEWS & REPORTS<br />
Bergmann Limeworks in Azendorf: Machinery was<br />
upgraded with three large scale equipment<br />
of Komatsu!<br />
The Limeworks J. Bergmann from Azendorf has upgraded its machinery with three large scale<br />
equipment from Komatsu. The machines, two crawler excavators <strong>and</strong> one dumper, which were<br />
supplied by Reif Baumaschinen, support annual extraction of approximately 350,000 tons of limestone<br />
from the two quarries in Azendorf.<br />
“We are a company that is rich in tradition”, says Dr.<br />
Thomas Jendersie. The <strong>Mining</strong> engineer is the technical<br />
director <strong>and</strong> general manager of the J. Bergmann GmbH &<br />
Co. Since 1908 the enterprise has been mining limestone<br />
in the Azendorf quarry, approximately 20 kilometers<br />
southwest of Bayreuth. Licenses <strong>for</strong> further 50 years<br />
have been obtained. The Franken-Maxit-Group belongs<br />
to the Bergmann company, with more than eight locations<br />
in Germany <strong>and</strong> a branch in the Czech Republic. Hans-<br />
Dieter Groppweis is the managing partner of Bergman<br />
Kalk <strong>and</strong> the Franken-Maxi-Group. His gr<strong>and</strong>father Johann<br />
Bergmann has founded the enterprise more than 100 years<br />
ago in Azendorf.<br />
Wheels must roll<br />
Today the group employs approximately 550 staff. 200 of<br />
them work in the Azendorf location. “We are responsible<br />
<strong>for</strong> the fact that the wheels of others roll”, Jendersie<br />
explains. What he means is that other locations of the<br />
group are dependant on the supplies from Azendorf. “It<br />
must run like clockwork”, says Jendersie. Failures should<br />
not be permitted, particularly in the machinery. “Otherwise<br />
the wheels of others stop”. With regard to the production<br />
plants, as well as the machinery, product quality <strong>and</strong> high<br />
reliability of supply have highest priority.<br />
Komatsu:<br />
The delivery of the three large-scale Komatsu machines was done on the site of the lime works in Azendorf. The picture shows the technical<br />
director <strong>and</strong> general manager of the J. Bergmann GmbH & Co., mining engineer Thomas Jendersie (third person from the <strong>rig</strong>ht in the <strong>for</strong>eground),<br />
together with the retailer <strong>for</strong> Reif Baumaschinen responsible <strong>for</strong> Ansbach, Stefan Kirsch (on his left), as well as staff of Bergmann at the symbolic<br />
h<strong>and</strong>over of keys.<br />
www.advanced-mining.com<br />
134