A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
A new face drilling rig for narrow tunnels and ... - Advanced Mining
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
al lMineral aUfBereitUngsteChnik gM Bh & Co. kg<br />
I<br />
Issue 04 | 2010<br />
A QUANTUM JUMP:<br />
NEWS & REPORTS<br />
t took them 5 years - from the first industrial unit to the biggest WHIMS ever built.<br />
And once again the Itaminas Mine in the heart of the Brazilian iron quadrangle in<br />
the state of Minas Gerais is the place to be. Where everything started in 2005 with a<br />
120 tph gaustec 3200 the <strong>new</strong> Mega- WHIMS gaustec® GX 3600 went into operation<br />
in July this year, at a capacity of 700 tph. Not by coincidence again the area of one<br />
of the largest iron ore deposits in the world became the birthplace of this <strong>new</strong> class<br />
of giant magnetic separators, where huge mining activities require huge equipment<br />
capacities.<br />
gaustec®-Gx 3600<br />
GAUSTEC®-Gx 3600<br />
GAUSTEC´S NEW x-TYPE MEGA- WHIMS<br />
From the very first moment up to now gaustec is<br />
convincing the customers with simple but intelligent<br />
solutions, from operators <strong>for</strong> operators. The<br />
implementation of numerous improvements to the well<br />
known JONES- WHIMS concept were honored by the<br />
market. Easier maintenance, less energy consumption<br />
as well as more flexibility by means of more parameters<br />
to adjust, i.e. better per<strong>for</strong>mance, led to more than 50<br />
gaustec®- WHIMS sold in five years only.<br />
And now with the <strong>new</strong> model capacities per unit have<br />
doubled at almost the same footprint, the same weight,<br />
the same energy consumption <strong>and</strong> the same efficiency,<br />
of course:<br />
IN OPERATION WITH 700 TPH!<br />
The <strong>new</strong> gaustec®- Gx 3600 with<br />
capacities from 360 to 800 tph¹).<br />
At the Itaminas plant the <strong>new</strong> gaustec®-GX 3600 is fed<br />
with hematite iron ore < 1 mm with a feed grade of about<br />
54 % Fe <strong>and</strong> 23 % SiO2 at a rate of 700 tph, 50 % solids.<br />
The product of this cobber stage is further upgraded in<br />
a second, already existing gaustec®-G 3600 to a final<br />
product of plus 66 % Fe <strong>and</strong> less than 3.0 % SiO2. The<br />
tailings of the cobber stage are fed to a gaustec®- GHP<br />
150, which works as a scavenger, producing tailings with<br />
about 18 % Fe <strong>and</strong> 60 % SiO2. With the future introduction<br />
of a grinding circuit <strong>for</strong> better liberation it is expected<br />
that the iron in the tailings can be reduced to less than<br />
10 % Fe, since by now only natural iron ore fines are<br />
processed.<br />
www.advanced-mining.com<br />
119