a Hütte type HBR 201 universal <strong>drilling</strong> machine with<br />
electro-hydraulic drive <strong>and</strong> an electrically powered<br />
Triplex mud pump.<br />
Project descriptiong<br />
Issue 04 | 2010<br />
TRANSFER OF TECHNOLOGY<br />
Sigmundshall <strong>drilling</strong> site 31 – drill <strong>rig</strong> being deployed under very hot conditions.<br />
(Foto: staff of consortium)<br />
A vertical NQ borehole 700 m in depth was drilled<br />
from the starting point, which was the <strong>for</strong>mer mine fan<br />
workshop at the 440 m below sea level (b.s.l.). After the<br />
hole had been surveyed the diameter was taken out to<br />
96 mm. The borehole was then surveyed with a georadar<br />
probe (EMR). After the results had been processed the<br />
four deviation points were determined according to the<br />
geological requirements <strong>and</strong> technical possibilities.<br />
From this vertical <strong>drilling</strong> deviated holes – each with a<br />
down-the-hole motor <strong>and</strong> a deviation of about 2° over<br />
10 m – were drilled in the predetermined direction at<br />
four different levels, namely at 239 m, 117 m, 72 m <strong>and</strong><br />
69 m. A 500 m b.s.l. cored section was then drilled from<br />
a start channel using the wireline <strong>drilling</strong> technique.<br />
After encountering some initial problems in the vertical<br />
section all four deviated holes were completed to the<br />
full satisfaction of the client.<br />
Thyssen Schachtbau GmbH is looking <strong>for</strong>ward to<br />
further successful collaboration with K+S KALI GmbH<br />
on future projects.<br />
Authors:<br />
Tilo Jautze, Frank Hansper & Michael Mizera<br />
FOR MORE INFORMATION AND CONTACT:<br />
Thyssen Schachtbau GmbH<br />
S<strong>and</strong>straße 107-135<br />
45473 Mülheim an der Ruhr | Germany<br />
Tel.: +49 (0)208 - 30 02 0<br />
Fax: +49 (0)208 - 30 02 3 27<br />
eMail: info@ts-gruppe.com<br />
Internet: www.thyssen-schachtbau.de<br />
www.advanced-mining.com<br />
99