03.03.2013 Views

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

A new face drilling rig for narrow tunnels and ... - Advanced Mining

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The consistently positive reactions of all participants<br />

encourages the Groeneveld group to continue the CEWEF<br />

series. The next Construction Equipment World Economic<br />

Forum was announced <strong>for</strong> fall of next year, again to be held<br />

in Brussels.<br />

Integral In<strong>for</strong>mation<br />

In the CEWEF seminar, a total of eight individual articles<br />

dealt with specified guiding themes, “Cost-effectiveness<br />

in machine operations”, “Safety” <strong>and</strong> “New developments<br />

in the construction machinery market”. This thematic<br />

structure ensured the practical relevance of all articles<br />

of the highly experienced speakers from the construction<br />

equipment <strong>and</strong> supply industry, as well providing ample<br />

opportunities <strong>for</strong> questions <strong>and</strong> suggestions from the<br />

plenum of experts. All articles can be accessed under<br />

www.cewef.com.<br />

More than 100 high-level experts<br />

follow the speeches of the 3rd CEWEF<br />

conference in Brussels.<br />

Issue 04 | 2010<br />

NEWS & REPORTS<br />

More than 100 high-level experts<br />

follow the speeches of the 3rd CEWEF<br />

conference in Brussels.<br />

In a way the basis of the profitability studies was a<br />

recourse to the „Total Cost of Ownership“-Model of the<br />

preceding CEWEF events. Apart <strong>for</strong>m the fixed costs of<br />

purchase, financing <strong>and</strong> residual value, this calculation<br />

of lifecycle costs of a construction machine also includes<br />

variable operation costs like personnel, fuel, maintenance<br />

<strong>and</strong> servicing, as well as additional equipment <strong>and</strong> spare<br />

parts. All speakers agreed to the fact that while the model<br />

is quite complex, it offers high potential <strong>for</strong> long-term<br />

savings, which can be converted into effectively traceable<br />

production costs (e.g. costs per ton), in case of exact (pre-)<br />

calculation.<br />

The range of topics with regard to safety predominantly<br />

dealt with the increasing requirements of occupational<br />

safety <strong>and</strong> health, but it also dealt with higher order<br />

aspects of sustainability of climate <strong>and</strong> environmental<br />

protection. The discussion here was mainly centered<br />

around economical effects of development <strong>and</strong> production<br />

www.advanced-mining.com<br />

127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!