20.03.2013 Views

Civil engineer guide to fighting positions, shelters, obstacles

Civil engineer guide to fighting positions, shelters, obstacles

Civil engineer guide to fighting positions, shelters, obstacles

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AFH 10-222 Volume 14 1 August 2008 143<br />

Material<br />

Thickness<br />

in Inches<br />

Small<br />

Caliber<br />

Machine<br />

Gun-<br />

From<br />

100<br />

Yards<br />

Antitank<br />

Rifle -<br />

From<br />

100<br />

Yards<br />

20mm<br />

Antitank<br />

Round -<br />

From<br />

200<br />

Yards<br />

37mm<br />

Antitank<br />

Round -<br />

From<br />

400<br />

Yards<br />

50mm<br />

Antitank<br />

Round<br />

– From<br />

400<br />

Yards<br />

75mm Note<br />

Round-<br />

From<br />

500 <strong>to</strong><br />

1000<br />

Yards<br />

Clay 42 60 NR NR NR NR 4<br />

Loam 36 48 60 NR NR NR 5<br />

Sand 24 36 48 NR NR NR 4<br />

Frozen Snow<br />

Frozen Soil<br />

Ice + Aggregate<br />

80<br />

24<br />

18<br />

80<br />

24<br />

18<br />

Snow and Ice<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

Tamped Snow<br />

Unpacked<br />

Snow<br />

72<br />

180<br />

72<br />

180<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

NR<br />

1 – Plain formed concrete walls<br />

2 – Reinforced with steel<br />

3 – Guidance only<br />

4 – Double the thickness when wet<br />

5 – Add 50% <strong>to</strong> thickness when wet<br />

6 – Thickness <strong>to</strong> nearest ½ ft<br />

7 – 3,000 psi concrete<br />

Notes

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!