BOGIES AND SUSPENSION - South Central Railway
BOGIES AND SUSPENSION - South Central Railway
BOGIES AND SUSPENSION - South Central Railway
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />
1 4<br />
Dust Guard<br />
Jack<br />
Cover<br />
Face seal<br />
Remove cover with face seal and raise journal box<br />
with help of jack or other device<br />
2 5<br />
3<br />
Remove plain bearing and wedge from Journal box.<br />
Lower Journal Box to the maximum possible. Insert pre oiled<br />
FRLP into journal box. Ensure it is centred from back to front and<br />
left to right keeping strap facing the front Not - Do not use any<br />
implements to push in FRLP which may tear FRLP cover<br />
WAGON MAINTENANCE MANUAL<br />
Wedge<br />
Bearing<br />
FR L P<br />
FIG. 6.12 : Fitment of FRLP<br />
6<br />
Removal plain bearing & wedge from journal box<br />
Lower journal box to normal position<br />
fill lubricating oil to 1/2" level in journal box.<br />
Fit back face seal cover<br />
Page 105 of 121<br />
Oil Level<br />
1/2"<br />
Note :<br />
1. Ensure dust guard and face seal is fitted with every FRLP<br />
2. For detail instructions see over leaf