02.04.2013 Views

BOGIES AND SUSPENSION - South Central Railway

BOGIES AND SUSPENSION - South Central Railway

BOGIES AND SUSPENSION - South Central Railway

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />

603 C. MAINTENANCE OF SUBASSEMBLIES<br />

a) MAINTENANCE OF CAST STEEL SIDE FRAME<br />

WAGON MAINTENANCE MANUAL<br />

Page 40 of 121<br />

It is very important that the axle box holes are drilled at correct<br />

distance from the centre of the casting. Also centre distance of the holes meant<br />

for the same axle box should be correct. Holes meant for riveting the spring<br />

plank should be correctly located and marked in the side frame as well as in<br />

the spring plank otherwise this will not give correct bogie alignment. After<br />

and before riveting, the holes alignment should be checked and corrected, if<br />

necessary. Similarly, after assembly of the tie bar, its alignment should be<br />

checked before final riveting it with the casting. For alignment, it is necessary<br />

to check whether the axle box bolt holes in the side frame & tie bar are in the<br />

same line and top and bottom holes are in alignment with each other. It should<br />

also ensured that tie bar is horizontal & parallel to the top surface and at<br />

correct distance from the top surface. The longitudinal edges of the tie bar<br />

should also be parallel to the top edge of the side frame otherwise, box will<br />

not fit properly.<br />

At the time of POH as well as in sick line, side frame should be<br />

examined for cracks, distortion, excessive pitting etc. During POH,<br />

longitudinal, transverse and diagonal distances of the journal centres should be<br />

checked to ascertain the squareness and correct alignment of the trolley. The<br />

permissible variation is 3 mm in longitudinal and diagonal distances, and 2<br />

mm in transverse distances. If the variation extends beyond these limits, the<br />

defects should be rectified.<br />

During POH the central distance of axle box holes and the diameter<br />

should be checked. Normally wear takes place in the hole. However the holes<br />

should be built up by welding & drilled to correct distance, when the dia<br />

exceeds by 2 mm above the nominal size. The steel bushes in the bracket of<br />

the brake beam hanger should be checked for wear and replaced when dia<br />

exceeds 0.75 mm above the nominal size. The rivets of the spring plank and<br />

tie bar should be checked for soundness. It should be replaced if found<br />

unsound. The alignment of the tie bar with corresponding top surface and side<br />

frame should be checked If found defective, it should be rectified.<br />

There is one drain hole in each of the top extended portion and two in<br />

bottom central portion of the side frame. During POH and in service, these<br />

holes should be cleaned and kept clear.<br />

b) MAINTENANCE OF SPRING PLANK<br />

It is important that the holes meant to secure the Cast Steel frame and<br />

Diamond frame bogies respectively are drilled correctly to ensure squareness<br />

and proper alignment of the trolley. Before finally riveting the squareness and<br />

alignment should be checked. In service, the spring plank is prone to corrosion<br />

and excessive pitting. The extent of pitting should be assessed at the time of<br />

POH. If necessary, the spring plank should be replaced.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!