BOGIES AND SUSPENSION - South Central Railway
BOGIES AND SUSPENSION - South Central Railway
BOGIES AND SUSPENSION - South Central Railway
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />
603 C. MAINTENANCE OF SUBASSEMBLIES<br />
a) MAINTENANCE OF CAST STEEL SIDE FRAME<br />
WAGON MAINTENANCE MANUAL<br />
Page 40 of 121<br />
It is very important that the axle box holes are drilled at correct<br />
distance from the centre of the casting. Also centre distance of the holes meant<br />
for the same axle box should be correct. Holes meant for riveting the spring<br />
plank should be correctly located and marked in the side frame as well as in<br />
the spring plank otherwise this will not give correct bogie alignment. After<br />
and before riveting, the holes alignment should be checked and corrected, if<br />
necessary. Similarly, after assembly of the tie bar, its alignment should be<br />
checked before final riveting it with the casting. For alignment, it is necessary<br />
to check whether the axle box bolt holes in the side frame & tie bar are in the<br />
same line and top and bottom holes are in alignment with each other. It should<br />
also ensured that tie bar is horizontal & parallel to the top surface and at<br />
correct distance from the top surface. The longitudinal edges of the tie bar<br />
should also be parallel to the top edge of the side frame otherwise, box will<br />
not fit properly.<br />
At the time of POH as well as in sick line, side frame should be<br />
examined for cracks, distortion, excessive pitting etc. During POH,<br />
longitudinal, transverse and diagonal distances of the journal centres should be<br />
checked to ascertain the squareness and correct alignment of the trolley. The<br />
permissible variation is 3 mm in longitudinal and diagonal distances, and 2<br />
mm in transverse distances. If the variation extends beyond these limits, the<br />
defects should be rectified.<br />
During POH the central distance of axle box holes and the diameter<br />
should be checked. Normally wear takes place in the hole. However the holes<br />
should be built up by welding & drilled to correct distance, when the dia<br />
exceeds by 2 mm above the nominal size. The steel bushes in the bracket of<br />
the brake beam hanger should be checked for wear and replaced when dia<br />
exceeds 0.75 mm above the nominal size. The rivets of the spring plank and<br />
tie bar should be checked for soundness. It should be replaced if found<br />
unsound. The alignment of the tie bar with corresponding top surface and side<br />
frame should be checked If found defective, it should be rectified.<br />
There is one drain hole in each of the top extended portion and two in<br />
bottom central portion of the side frame. During POH and in service, these<br />
holes should be cleaned and kept clear.<br />
b) MAINTENANCE OF SPRING PLANK<br />
It is important that the holes meant to secure the Cast Steel frame and<br />
Diamond frame bogies respectively are drilled correctly to ensure squareness<br />
and proper alignment of the trolley. Before finally riveting the squareness and<br />
alignment should be checked. In service, the spring plank is prone to corrosion<br />
and excessive pitting. The extent of pitting should be assessed at the time of<br />
POH. If necessary, the spring plank should be replaced.