CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />
WAGON MAINTENANCE MANUAL<br />
Page 48 of 121<br />
At the time of POH, if the holes are found to exceed 2 mm in<br />
dia above the nominal dia, it should be built up by welding and holes<br />
should be drilled to correct size. Normally no wear takes place on these<br />
holes. At the time of POH and in service, the bottom arch bar should<br />
be checked for cracks breakage and loss in off - set. If these defects are<br />
found, it should be renewed/ repaired. There are hardly any case of<br />
cracking or breakage of bottom arch bar.<br />
VII. BOGIE SPRING PLANK PACKING<br />
Four numbers are required for each trolley. It is placed between<br />
the vertical side of the spring plank and column and these are secured<br />
together by rivets. Each packing plate has two rivet holes. The rivet<br />
holes should be drilled at correct locations. Packing plates are provided<br />
only if necessary on diamond frame bogies. It gives enough space for<br />
inserting and withdrawing the floating bolsters to and from the side<br />
frame.<br />
e. AXLE BOX WITH SIDE FRAME<br />
This is identical to Cast Steel Bogie axle box and side frame<br />
covered earlier in this chapter.<br />
604 B. REPAIR <strong>AND</strong> MAINTENANCE IN SICK LINE<br />
i. The tie bar should be checked for crack/breakage. Cracked tie bars should be<br />
changed.<br />
ii. The column should be checked for cracks distortion etc. and necessary<br />
replacement/repairs should be done.<br />
iii. The rivets should also be checked for cracks/breakage and slackness and<br />
renewed.<br />
iv. The brake beam hanger bracket bushes should be checked for wear and be<br />
replaced if necessary.<br />
v. Repair of Top & bottom arch bar to be done as given in para 604 A (a) V, VI..<br />
604 C. REPAIR <strong>AND</strong> MAINTENANCE DURING ROH & POH<br />
In addition to all the work mentioned above in para 604 B, the following work<br />
is also to be carried out in ROH & POH :-<br />
a. The column should be checked for cracks, distortion etc. and<br />
replacement/repairs should be done. The four rivets should be checked for<br />
cracks/breakage and slackness and renewed.