02.04.2013 Views

BOGIES AND SUSPENSION - South Central Railway

BOGIES AND SUSPENSION - South Central Railway

BOGIES AND SUSPENSION - South Central Railway

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />

WAGON MAINTENANCE MANUAL<br />

Page 74 of 121<br />

x) Protect the roller bearings and axle boxes mounted on axles before the<br />

wheel-sets are sent for tyre turning by dummy faceplate.<br />

xi) Charge fresh grease of approved Brand and recommended quantity in the<br />

axle boxes, before mounting.<br />

xii) Change the wheel set fitted with roller bearing whenever a warm/hot box<br />

is detected.<br />

xiii) Short circuit the roller bearing while carrying out welding repairs on the<br />

bogies or wagon-body fitted with roller bearings.<br />

xiv) The date of POH & Shop code shall be stamped on the axle box.<br />

xv) Axle-Cover bolts of cylindrical RB axle boxes should be fitted with the<br />

locking washers on the line unless otherwise stipulated.<br />

b) Don’ts<br />

(i) Cleaning with compressed air is totally prohibited.<br />

(ii) All locking washers/plates used for locking the bolt/nuts in the ‘Axle-<br />

Cap’ and ‘Front Cover’ should never be used twice and should<br />

invariably be replaced at the time of POH/ROH.<br />

(iii) Do not over-charge the grease in the axle boxes.<br />

(iv) Do not recharge the grease in between the two POH.<br />

(v) Do not open the roller bearing axle boxes in sick line /Yard, except for<br />

the specified examination/attention at the nominated sick line.<br />

(vi) Do not carry out any welding on the wagons, without earth the bogie<br />

frame/wagon body.<br />

(vii) Do not carry out any welding on the axle box during POH, except for<br />

provision of manganese liners under special precautions, as stipulated.<br />

605 L. REPAIR <strong>AND</strong> MAINTENANCE IN SICK LINE<br />

a) The Scroll iron is to be checked for<br />

i. Rivets loose, deficient or broken<br />

ii. Scroll iron cracked or broken<br />

iii. Scroll iron shifted out of alignment<br />

iv. Eye hole worn over size or oval<br />

The repairs should be done as given in para 605 B (a)<br />

b) Shackle pin is checked and to be repaired as given in para 605 B (b)<br />

c) Cotters found to be broken, deficient or wrong size, not split properly and some<br />

times jib not in correct position. In the first three cases the cotter should be<br />

replaced and in the last two cases, it should be fitted properly or replaced where<br />

necessary.<br />

d) Spring to be examined and repaired as given in para 605 B (h)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!