CHAPTER 6 – <strong>BOGIES</strong> <strong>AND</strong> <strong>SUSPENSION</strong><br />
WAGON MAINTENANCE MANUAL<br />
Page 69 of 121<br />
(v) The Broad Gauge leg type of axle guards, if repaired by welding or<br />
patching, should be provided with cross-bracing.<br />
III. WELDING OF MANGANESE STEEL LINERS ON ROLLER BEARING<br />
AXLE BOXES.<br />
The procedure to be followed at the time of welding manganese steel liners on<br />
axle boxes will be as under :-<br />
(i) Process - Only manual metal arc process with RDSO approved brand of<br />
electrodes suitable for welding Manganese Steel should be<br />
used.<br />
(ii) Weld Position - The welding shall be done in down hand position.<br />
(iii) Electric current characteristics - The current used shall be direct<br />
current (D.C.) keeping the electrode positive and the work piece negative.<br />
The current value should be according to the electrode manufactures<br />
recommendations.<br />
(iv) Fit up and Welding Technique<br />
Prior to welding, the liners shall be clamped squarely in place to<br />
hold them flat against the housing. Clearance between liners and<br />
the prepared lug surface before and after welding shall not exceed<br />
.006” (0.152 mm).<br />
Care must be taken to prevent cracking of liners.<br />
Clamp the liners, check the dimensions/alignment, adjust if<br />
required and tack weld if correctly aligned.<br />
IV. The axle box body (casing) should be either preheated or immersed in water as<br />
detailed below:-<br />
Procedure No. 1 : Pre-heating method –<br />
The axle box casing should be preheated uniformly to about<br />
250 o C-300 o C before welding is undertaken and then placed in<br />
position to facilitate down hand welding.<br />
On completion of welding the axle box casing should be allowed to<br />
cool in still air.<br />
Procedure No. 2: Submersion under water –<br />
The axle box casing should be immersed under water in a suitable<br />
container duly earth. The level of the water should be such that<br />
only guide portion (lug) requiring welding remains above waterlevel.