Chapter ñ10 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />

2. Sewerage Proposals<br />

The Detailed Project Report was prepared by TWAD Board. They estimate total<br />

length of sewerage 72.44 km and the sub pumping Station located one in northern<br />

bank of river Goundanya and another one in southeren bank of river Goundanya.<br />

The Sewage Treatment Plant of capacity of 31.39 mld (ASP Technology) is proposed<br />

to be located near Indira Nagar<br />

The two new public conveniences to proposed in sheriff Nagar and Ashok Nagar at<br />

an estimated cost of Rs. 4083.63 Lacs<br />

Table 10-3: Capital Investment Needs for the Sewerage System and Public<br />

S. No Descripition<br />

Conveniences<br />

- 94 -<br />

Cost in Rs.<br />

Lacs<br />

1 Collection system 1371.00<br />

2 Pumping station, pump sets 234.79<br />

3 Pumping Main 299.16<br />

4 Sewage Treatment Plant 600.00<br />

5 House Service Connection 444.74<br />

6 Sewage Cleaning Equipment 35.00<br />

Sub Total I 2984.69<br />

7 Physical Contingencies at 2.5 % 74.62<br />

8 Unforeseen items of work at 2.5 % 74.62<br />

9<br />

10<br />

Sub Total II 3133.93<br />

Supervision Charges at 5 % 156.70<br />

Sub Total III 3290.62<br />

Miscellaneous Items of works such as Road Restoration<br />

,EB Deposit, Deposit to Telephone Dept<br />

47.94<br />

Add 1 % for Inter Dept Permission on Miscellaneous<br />

Items<br />

0.47<br />

Sub Total IV 3339.03<br />

11 Add for price escalation at 10 % for 2 years 700.81<br />

Total 4039.84<br />

12 Public Conveniences<br />

New Toilets at Ashok Nagar & Sherif Nagar<br />

16.29<br />

10.1.3 Drainage<br />

1. Needs:<br />

Up gradation of existing 10 public toilets 27.50<br />

Grand Total 4083.63<br />

The existing drainage condition of <strong>Gudiyattam</strong> consists of tanks and manmade<br />

drainage system (Storm water open drains). Due to the natural slope of the town, all<br />

the drains discharge water in Palar River. The present condition of Storm Water<br />

Voyants Solutions Private Limited