22.07.2013 Views

Gudiyattam Gudiyattam Town - Municipal

Gudiyattam Gudiyattam Town - Municipal

Gudiyattam Gudiyattam Town - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter ñ 7 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />

(WS, UGSS, UIDSSMT & IHSDP Projects)<br />

4 Overseers (UIDSSMT & IHSDP Projects) Engineering 1<br />

Total 6<br />

Source: Analysis and discussions with <strong>Municipal</strong> officials<br />

7.7 INSTITUTIONAL FRAMEWORK FOR SERVICE DELIVERY<br />

The responsibility for good governance and management is vested with the<br />

<strong>Municipal</strong>ity. Although, the municipality is responsible for overall development of<br />

the town including provision and maintenance of services, there are other agencies<br />

responsible for planning, development and provision of specific services. Such key<br />

stakeholders include:<br />

Table 7-3: Institutional Framework for Urban Service Delivery<br />

S.No Services Planning and design Implementing<br />

1 Master plan preparation and<br />

Updation<br />

- 42 -<br />

agency<br />

DTCP <strong>Municipal</strong>ity<br />

2 Water Supply TWAD TWAD<br />

3 Sewerage TWAD TWAD<br />

4 Drainage ULB ULB<br />

5 Solid waste Management ULB/CMA/TNUIFSL ULB<br />

6 Roads and Highways Highways dept /<br />

<strong>Municipal</strong>ity<br />

7 Bridges and water bodies <strong>Municipal</strong>ity /<br />

CMA/PWD<br />

Highways dept /<br />

<strong>Municipal</strong>ity<br />

<strong>Municipal</strong>ity / PWD<br />

8 Street Lighting <strong>Municipal</strong>ity/TNUIFSL <strong>Municipal</strong>ity<br />

9 Parks and playfields <strong>Municipal</strong>ity <strong>Municipal</strong>ity<br />

10 Health and Education GoTN / <strong>Municipal</strong>ity GoTN / <strong>Municipal</strong>ity<br />

11 Slum Development <strong>Municipal</strong>ity/ TNSCB <strong>Municipal</strong>ity<br />

12 Environmental protection TNPCB<br />

7.8 ORGANIZATION MANAGEMENT<br />

As been seen from various sections of the report particularly relating to service<br />

deliveries, there are gaps of various sizes which result in a shortage in the delivery<br />

system. This could be overcome by certain specific options:<br />

In most of the service sections of the <strong>Municipal</strong>ity, there are vacancies which<br />

could be filled up. This alone may not ensure a totally satisfactory delivery of<br />

the services as it requires an efficient personnel management.<br />

The organization and delivery mechanism in some of the important personnel<br />

intensive service sectors has to be modernized. To mention the important few<br />

particulars relate to Solid Waste Management, where large no. of workers<br />

and staff are involved, could be modernized resorting to localized and more<br />

efficient composting and Landfill system. This could be assigned to NGOs,<br />

voluntary organizations or even the respective resident associations in the<br />

various colonies. This is a remunerative venture as is proved in many places.<br />

This process not only will significantly reduce the burden of the <strong>Municipal</strong>ity in<br />

Voyants Solutions Private<br />

Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!