Chapter ñ14 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
Operating Ratio 1.12 1.59 1.37<br />
Debt Service Ratio 32% 89% 66%<br />
Category 3<br />
Long Term (2009-10 to 2028-<br />
29)<br />
Operating Ratio 1.12 1.59 1.31<br />
Debt Service Ratio 13% 89% 49%<br />
Category 3<br />
Note : 1 ñ Financially Sound; 2 ñ Financially Fragile; 3 ñ Financially Insolvent<br />
It may be observed that the <strong>Municipal</strong>ity is financially very fragile both in the short<br />
term and long term. The <strong>Municipal</strong>ity is unable to bear the high operation &<br />
maintenance expenses and interest cost on borrowings resulting in operating ratio ><br />
1% and Debt Service Ratio > 30%.<br />
14.12 INFERENCE.<br />
The investment capacity of Gudiyatham <strong>Municipal</strong>ity on ëAs is Where Basisí works<br />
out to Rs. 3973 lacs.<br />
The investment capacity of Gudiyatham <strong>Municipal</strong>ity works to Nil in case of<br />
Scenario II (With Metur CWSS project) and Nil in case of Scenario III (Without<br />
Metur CWSS project).<br />
Thus it can be inferred that Gudiyatham <strong>Municipal</strong>ityís financial position is weak<br />
and is not in a position to undertake major projects like water supply<br />
improvements and underground by way of borrowings on account of high<br />
operation & maintenance expenses and interest cost.<br />
Based on the above, it can be concluded that the <strong>Municipal</strong>ity based on its<br />
financial position can undertake only smaller projects identified in the CCP as<br />
given below :<br />
S.No. Particulars Total Priority Funding By<br />
A Physical Infrastructure Facilities L : G : M<br />
I Bus Stand<br />
a) Construction of New Bus Stand 300.00 B 90:00:10<br />
II Street Lights<br />
a) Proposed new lights 40.00 A 100% ULB<br />
b) Retrofitting existing lights & energy saving devices 15.86 A ESCO<br />
B Social Infrastructure Facilities<br />
- 165 -<br />
Voyants Solutions Private Limited