Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Annexure Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
Out of 17 schools, 10 schools are in damaged condition, it should be renovated<br />
like a private schools.<br />
Gudiyatham <strong>Municipal</strong>ity requires Industrial Estate.<br />
Thiru. S.Soundarrajan, Vice Chairman<br />
People of <strong>Gudiyattam</strong> are very co-operative and want improved infrastructure<br />
in terms of sewerage and sanitation<br />
The approach Road from Vellore to <strong>Gudiyattam</strong> and the connectivity from<br />
<strong>Gudiyattam</strong> need widening for better accessibility of town.<br />
The roads are encroached in town and there is a heavy congestion near the<br />
Bus- Stand so need to regularize the development.<br />
Drainage system is not appropriate and need improvement after the laying of<br />
sewerage system so that water can be treated in an effective way<br />
There is a need to assess the properties of the town and slum needs<br />
regularization and improved infrastructure.<br />
It is necessary that the Govt. should release the fund on time to utilize in better<br />
way.<br />
Thiru R.Subramanian, Commissioner<br />
City needs additional sources to provide 135 LPCD water upto Ultimate year.<br />
More numbers of additional remunerative projects to be required.<br />
The exiting bus stand needs to be improvements.<br />
Out of two burial ground, one burial ground to be changed as a Gasifier<br />
Crematorium.<br />
The feasibility studies to be conducted for by pass road and River cause Bridge<br />
by respective other departments.<br />
Existing transition main and distribution line of water supply to be changed based<br />
on its life period.<br />
Thiru U.Saravanan, <strong>Municipal</strong> Engineer<br />
City need additional sources to provide 135 LPCD water and the augmentation<br />
of source need funding from CMA.<br />
Sewerage system is necessary for the town as without that the cleaning of drains<br />
can not be possible in an effective way<br />
Railways station road have more traffic congestion area ,it affects the traffic<br />
flow of the road,<br />
The municipality is putting money for solid waste management but it is not<br />
sufficient and need a detailed plan and additional source of fund for tools and<br />
site development.<br />
Thiru. G. Devaraji, Councilor, Ward No - 11<br />
Required underground sewerage system<br />
- 173 -<br />
Voyants Solutions Private Limited