Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Annexure Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
Thiru. S. Ravi, Councilor, Ward No - 9<br />
There is a need for technical institutions in <strong>Gudiyattam</strong> to get the people<br />
trained.<br />
There is a need to upgrade the infrastructure facilities in school<br />
Modernized public toilets to be required for Bazzar area and bus stand.<br />
Tmt.Malika , President Innerwheel Association<br />
The solid waste management to be improved like Chennai city<br />
The transportation facilities of the Solid waste should be stick a per their time<br />
schedule.<br />
The Under ground drainage required very soon and proper treatment system<br />
require at right place of the town<br />
The footsteps required for Uzalavar Sandhai and weekly market area.<br />
Rainwater harvesting to be implement in every home.<br />
Thiru. N.Krishnan, President ñ Traders Association<br />
Separate toilet room required for Main Bazzar area and weekly market area.<br />
The slaughterhouse wastewater should be treat and then dispose to the water<br />
bodies.<br />
Traffic flow should be maintained by traffic police.<br />
The road side encroachment should be removed by the town planning Officer.<br />
Generator facilities required for municipal office<br />
The remunerative projects to be implement forth coming years.<br />
Thiru.V.Rajenedran, A.E., TWAD Board.<br />
TWAD board prepared Detailed Project Report for water supply to meet<br />
intermediate demand of water.<br />
The ultimate requirement of water may meet out from Combined Mettur<br />
Scheme (Cauvery as a source) , the feasibility studies under progress.<br />
The UGD detailed project report was already prepared, waiting for CMA<br />
approval.<br />
These are some of the suggestions provided by the key person of the municipality,<br />
the major focus was to develop infrastructure in the town and it should be done is a<br />
systematic way. The basic infrastructure should be provided to every people and<br />
the nominal charges should be applied on the available so that the people can<br />
pay it. After the discussion Chairman and municipal engineer thanked all the<br />
councilors and key people who attended the discussion. The consultant distributed<br />
the formats to each of the person present in the meeting to take individuals view<br />
and priority of infrastructure development and to note down the suggestion and<br />
briefed the survey format and after the stakeholders finished the filling of survey<br />
formats Mr. Saravanan thanked all the people attended the Stakeholdersí<br />
Workshop.<br />
- 175 -<br />
Voyants Solutions Private Limited