Chapter ñ10 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
As per standard, every 10,000 population required 1 Acers. At present 14.81<br />
acres available, for ultimate stage it require 1.19 Acres.<br />
1 JCB for disposal site and composting operating plant operation<br />
The feasibility studies under progress by Anna university to centralize sanitary landfill<br />
which requires for Gudiyatham, Ambur, Vaniyambadi and Pernampet<br />
<strong>Municipal</strong>ities.<br />
Also it is not viable to propose a separate Sanitary landfill facilities for each<br />
municipalities, since land is not available to construct sanitary landfill. So, it is<br />
proposed to construct combined sanitary landfill at Agaramcheri village and Ulli<br />
village to the above mentioned municipalities. Figure10.2 shows the location of<br />
identified site for sanitary Landfill. The proportionate cost for the construction of<br />
Sanitary Landfill is presented in Table 10.5.<br />
The estimated cost for improvement of solid waste Management of Rs. 853.08 Lacs<br />
including proportionate cost for landfill.<br />