Chapter ñ10 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />

10.1 PHYSICAL INFRASTRUCTURE - IMPROVEMENT NEEDS<br />

In chapter -6 the problems and issues of the physical infrastructure as well as social<br />

infrastructure sector has been identified. Also the projects identified by the<br />

municipality for the following sectors which are mostly curative measures in the<br />

particular sector and not for the future needs. Here it is discussed about the<br />

shortcomings in the projects identified by the municipality or by the different<br />

agencies i.e. <strong>Municipal</strong>ity, TWAD board etc. and discuss about the improvement<br />

needs, future proposals and funding pattern.<br />

10.1.1 Water Supply:<br />

1. Improvement Needs:<br />

The frequent bursts and leaks in the main from Palar Head Works and Goundya River<br />

is causing problem. Though the municipality has meted out temporary repairs, a<br />

permanent solution is required for an effective distribution of water supply to the<br />

town. The lines were mostly laid more than 30 years before and they need<br />

replacement. So there should be a comprehensive study for effective solution for<br />

water supply provision and rezoning.<br />

2. Water Supply Proposals<br />

The TWAD Board has estimated additionally 3 numbers of infiltration well , 3 open<br />

well , 15 deep bore well ,and distribution line 42.336 Km of sizes varying 90 to 140 mm<br />

PVC 6 KSC km and 2 Service Reservoir. The total cost of the estimate around 5.90<br />

Crores.<br />

The main draw back of the proposal by the TWAD board is in terms of supply side as<br />

they had proposed the supply of water to 70 % population through House Service<br />

Connection and 40 LPCD for 30 % population through Public Fountain at the<br />

intermediate year 2024.But, there has no further improvement on increasing water<br />

supply to 135 lpcd, because the yield of both Palar and Goundanya river was an<br />

reducing stage only.<br />

As per TWAD board proposal, the water demand at intermediate year 14.26MLD,<br />

they proposed additional infiltration wells, bore wells and open wells are met upto<br />

11.59 MLD.The Ultimate demand shall be fulfilled using combined Mettur scheme. The<br />

Detailed Project Report for this scheme is under preparation by TWAD Board. The<br />

water allotment details from Mettur scheme for various municipalities are shown in<br />

Figure 10.1<br />

The existing Transmission line already exceeds its design period, the replacement of<br />

transmission line at a cost of Rs.1.72 Crores.<br />

As of now, there has no bulk meters system in exiting system as well as proposed<br />

scheme also for the leakage detection. The Bulk metering system required in head<br />

works and service reservoir will therefore have to be implemented. The System was<br />

taken up to install 7 Nos, at a cost of Rs. 21Lacs.<br />