Chapter ñ10 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
10.1 PHYSICAL INFRASTRUCTURE - IMPROVEMENT NEEDS<br />
In chapter -6 the problems and issues of the physical infrastructure as well as social<br />
infrastructure sector has been identified. Also the projects identified by the<br />
municipality for the following sectors which are mostly curative measures in the<br />
particular sector and not for the future needs. Here it is discussed about the<br />
shortcomings in the projects identified by the municipality or by the different<br />
agencies i.e. <strong>Municipal</strong>ity, TWAD board etc. and discuss about the improvement<br />
needs, future proposals and funding pattern.<br />
10.1.1 Water Supply:<br />
1. Improvement Needs:<br />
The frequent bursts and leaks in the main from Palar Head Works and Goundya River<br />
is causing problem. Though the municipality has meted out temporary repairs, a<br />
permanent solution is required for an effective distribution of water supply to the<br />
town. The lines were mostly laid more than 30 years before and they need<br />
replacement. So there should be a comprehensive study for effective solution for<br />
water supply provision and rezoning.<br />
2. Water Supply Proposals<br />
The TWAD Board has estimated additionally 3 numbers of infiltration well , 3 open<br />
well , 15 deep bore well ,and distribution line 42.336 Km of sizes varying 90 to 140 mm<br />
PVC 6 KSC km and 2 Service Reservoir. The total cost of the estimate around 5.90<br />
Crores.<br />
The main draw back of the proposal by the TWAD board is in terms of supply side as<br />
they had proposed the supply of water to 70 % population through House Service<br />
Connection and 40 LPCD for 30 % population through Public Fountain at the<br />
intermediate year 2024.But, there has no further improvement on increasing water<br />
supply to 135 lpcd, because the yield of both Palar and Goundanya river was an<br />
reducing stage only.<br />
As per TWAD board proposal, the water demand at intermediate year 14.26MLD,<br />
they proposed additional infiltration wells, bore wells and open wells are met upto<br />
11.59 MLD.The Ultimate demand shall be fulfilled using combined Mettur scheme. The<br />
Detailed Project Report for this scheme is under preparation by TWAD Board. The<br />
water allotment details from Mettur scheme for various municipalities are shown in<br />
Figure 10.1<br />
The existing Transmission line already exceeds its design period, the replacement of<br />
transmission line at a cost of Rs.1.72 Crores.<br />
As of now, there has no bulk meters system in exiting system as well as proposed<br />
scheme also for the leakage detection. The Bulk metering system required in head<br />
works and service reservoir will therefore have to be implemented. The System was<br />
taken up to install 7 Nos, at a cost of Rs. 21Lacs.<br />