Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
Gudiyattam Gudiyattam Town - Municipal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter ñ14 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
The water charges shall be revised as below :<br />
Residential - Rs.60.00 p.m<br />
Commercial ñ Rs.250.00 p.m<br />
Industrial - Rs. 300.00 p.m.<br />
It is also assumed that the water connection charges shall be revised as under :<br />
Residential - Rs.4000<br />
Commercial - Rs.8000<br />
Industrial - Rs.12000<br />
It is assumed that water charges shall be increased as below every 5 years :<br />
Residential - Rs.15.00 p.m<br />
Commercial & industrial ñ Rs.25.00 p.m<br />
It is assumed that water connection charges shall increase every 5 years as below :<br />
Residential - Rs.1000<br />
Commercial & industrial ñ Rs.2000<br />
The house service connection as % of property tax assessments is as below:<br />
Table 14-8: House Service Connections - Percentage<br />
Year 2004-05 Property tax assessments House service connections %<br />
Residential 10063 6095 61%<br />
Commercial 3923 73 2%<br />
Industrial & Govt. 550 4 1%<br />
The improvements in water supply shall result in increase in operation &<br />
maintenance by Rs.45 lakhs per annum and the same shall increase @ 5% per<br />
annum<br />
The Metur CWSS Scheme shall result in increase in operation & maintenance cost by<br />
Rs. 245 lacs and the same shall increase @ 5% p.a.<br />
14.5.10 Drainage Charges<br />
The <strong>Municipal</strong>ity does not have Under Ground Sewerage System. A new<br />
underground sewerage system is proposed to be built at a cost of Rs.4040 lakhs. The<br />
implementation period is 2 years starting from 2011-12 to 2012-13. On completion of<br />
the scheme, it is assumed that around 70% of the property tax assessments would<br />
have sewerage connection. It is assumed that the scheme shall be completed as<br />
below :<br />
2011-12 50%<br />
2012-13 50%<br />
The Deposits and Charges shall be collected accordingly.<br />
- 149 -<br />
Voyants Solutions Private Limited