22.07.2013 Views

Gudiyattam Gudiyattam Town - Municipal

Gudiyattam Gudiyattam Town - Municipal

Gudiyattam Gudiyattam Town - Municipal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter ñ14 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />

The water charges shall be revised as below :<br />

Residential - Rs.60.00 p.m<br />

Commercial ñ Rs.250.00 p.m<br />

Industrial - Rs. 300.00 p.m.<br />

It is also assumed that the water connection charges shall be revised as under :<br />

Residential - Rs.4000<br />

Commercial - Rs.8000<br />

Industrial - Rs.12000<br />

It is assumed that water charges shall be increased as below every 5 years :<br />

Residential - Rs.15.00 p.m<br />

Commercial & industrial ñ Rs.25.00 p.m<br />

It is assumed that water connection charges shall increase every 5 years as below :<br />

Residential - Rs.1000<br />

Commercial & industrial ñ Rs.2000<br />

The house service connection as % of property tax assessments is as below:<br />

Table 14-8: House Service Connections - Percentage<br />

Year 2004-05 Property tax assessments House service connections %<br />

Residential 10063 6095 61%<br />

Commercial 3923 73 2%<br />

Industrial & Govt. 550 4 1%<br />

The improvements in water supply shall result in increase in operation &<br />

maintenance by Rs.45 lakhs per annum and the same shall increase @ 5% per<br />

annum<br />

The Metur CWSS Scheme shall result in increase in operation & maintenance cost by<br />

Rs. 245 lacs and the same shall increase @ 5% p.a.<br />

14.5.10 Drainage Charges<br />

The <strong>Municipal</strong>ity does not have Under Ground Sewerage System. A new<br />

underground sewerage system is proposed to be built at a cost of Rs.4040 lakhs. The<br />

implementation period is 2 years starting from 2011-12 to 2012-13. On completion of<br />

the scheme, it is assumed that around 70% of the property tax assessments would<br />

have sewerage connection. It is assumed that the scheme shall be completed as<br />

below :<br />

2011-12 50%<br />

2012-13 50%<br />

The Deposits and Charges shall be collected accordingly.<br />

- 149 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!