Chapter ñ12 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />
encompassing audits for energy saving performance, design & implementation of<br />
conservation measures, maintenance, operation and management of the<br />
introduced facilities and procurement of project funds. ESCOs conduct retrofitting<br />
for energy conservation without damaging the environment. The ESCO will<br />
guarantee the savings that would meet or exceed the annual payments to cover<br />
up the entire project costs usually a period of 5 to 10 years. The savings can be<br />
shared proportionately with the institution for which the project is designed and<br />
implemented for.<br />
The salient features of performance contracting for energy savings through ESCO<br />
based business model are as under:<br />
1 'Nil' investment by customer.<br />
2. ESCO to identify Energy Efficient Measures (EEMs) to replace / modify existing<br />
in efficient systems.<br />
3. ESCO supplies, installs and maintains the Energy Efficient Measures (EEMs)<br />
during the contract period.<br />
4. Contract period could be 3-5 years or as mutually agreed upon.<br />
5. Energy saving is shared between ESCO and customer as per agreed terms.<br />
Total project cost is funded by ESCO. The O & M expenses will be met by the<br />
<strong>Municipal</strong>ity.<br />
6. Guarantee Energy savings and recover its investment including interest &<br />
other costs out of generated energy savings.<br />
Sl.No Reforms<br />
1 Energy audit<br />
Table 12-5: Road Map for Energy and Resource efficiency<br />
- 122 -<br />
Year<br />
1<br />
Year of Implementation<br />
i Leak detection study √<br />
ii Fixing of bulk water meter √<br />
iii<br />
iv<br />
Fixing flow control values and<br />
meters<br />
Implementing energy saving<br />
measures on street lights and<br />
pumping machineries (ESCo)<br />
12.3.7 Action plan: Computerization and E-governance<br />
Strategy options<br />
√<br />
Year 2 Year 3 Year 4 Year 5<br />
√<br />
Voyants Solutions Private Limited