Chapter ñ10 Final Report: <strong>Gudiyattam</strong> <strong>Municipal</strong>ity<br />

10 CAPIITAL IINVESTMENT NEEDS FOR IIDENTIIFIIED<br />

PROJECTS<br />

All the projects relating to urban infrastructure, urban growth and development<br />

have been identified through a conscious participatory process. The projects are in<br />

the form of improvements and, extension of the existing services and facilities such<br />

that the present inadequacies as per the norms and standards are made up and, in<br />

addition meet the requirements of the projected population of the town during the<br />

perspective period of plan.<br />

Each project component, as identified has been verified in the field of their<br />

suitability and feasibility in terms of location, coverage and adequacy and finalized<br />

with as intensive consultation with the office of the municipality and as suggested<br />

and recommended in the review meetings of the previous stage of this exercise in<br />

the office of TNUIFSL. The projects thus finalized and firmed up are detailed thus<br />

finalized and firmed up are detailed out in their present status, gaps, projected<br />

requirements, cost estimates, capital needs, funding pattern etc in the following<br />

section. In all the identified projects constituting physical and social infrastructure<br />

facilities and other projects including bus stand, remunerating projects are including<br />

cost about Rs. 164.34 crores to be implemented starting from the current financial<br />

year. These projects have been prioritized as warranted in their importance over the<br />

implementation time frame. The Capital Investment Plan has been prepared based<br />

on <strong>Gudiyattam</strong> Master Plan of the DTCP.<br />

The projects, breakup of the investment and implementation schedule are given in<br />

the following tables:<br />

Table 10-1: Summery of Capital Investments under CCCBP<br />

S. No. Focus Area Total Cost Rs.in Lacs<br />

1 Water Supply & Mettur scheme 8224.33<br />

2 Sewerage & Sanitation 4083.63<br />

3 Solid Waste Management 853.08<br />

4 Drainage 312.00<br />

5 Traffic & Transportation 874.19<br />

6 Streetlight 55.86<br />

7 Education 241.20<br />

8 Parks 77.00<br />

9 Market 1027.00<br />

10 Slaughter house 8.00<br />

11 Burial ground 75.38<br />

12 Urban & <strong>Municipal</strong> Reform 48.00<br />

13 Slum Up-gradation including 554.00<br />

14 Total 16433.67<br />

. - 89 -<br />

Voyants Solutions Private Limited