01.08.2013 Views

Request for Proposal for e Ticketing Project - Archaeological Survey ...

Request for Proposal for e Ticketing Project - Archaeological Survey ...

Request for Proposal for e Ticketing Project - Archaeological Survey ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RFP <strong>for</strong> e-<strong>Ticketing</strong> Solution Volume-II<br />

(S)He Should have relevant experience in managing systems, people in<br />

retail chains<br />

(S)He should be fluent in English, local language and Hindi will be a must<br />

b. Responsibility<br />

(S)He should be responsible <strong>for</strong> managing the end to end operations of<br />

POS.<br />

(S)He will be responsible <strong>for</strong> customer service, inventory, customer<br />

complaints etc.<br />

(S)He will be responsible <strong>for</strong> the team managing the POS<br />

(S)He will be responsible to ensure smooth operations during peak hours<br />

and ensure proper resource allocations to manage large crowds<br />

(S)He should be familiar with the overall deployment of solution<br />

(S)He should manage the flow of work within the team and ensure<br />

optimum allocation of work amongst team members.<br />

3.3.9 Staff – Ticket Issuance and Verification – POS<br />

a. Profile<br />

(S)He should have an experience of over 2 years in managing operations<br />

of a similar nature of work<br />

(S)He must be preferably minimum Diploma / Graduate holder in any<br />

discipline from a reputed university.<br />

(S)He Should have adequate knowledge to handle computers<br />

(S)He should be fluent in English, local language and Hindi shall be a must<br />

b. Responsibility<br />

(S)He should be responsible <strong>for</strong> managing the end to end operations of<br />

POS.<br />

(S)he should be responsible <strong>for</strong> managing cash collections<br />

(S)He should be responsible <strong>for</strong> managing large crowds at the<br />

Monuments<br />

(S)He will be responsible <strong>for</strong> customer service, inventory, customer<br />

complaints etc.<br />

(S)He should be familiar with the overall deployment of solution<br />

3.4 General instructions <strong>for</strong> proposing the team<br />

3.4.1 Bidder should provide adequate number of personnel, with a clear definition<br />

of the role and responsibility of each.<br />

<strong>Archaeological</strong> <strong>Survey</strong> of India, Ministry of Culture Page 16 of 79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!