01.08.2013 Views

Request for Proposal for e Ticketing Project - Archaeological Survey ...

Request for Proposal for e Ticketing Project - Archaeological Survey ...

Request for Proposal for e Ticketing Project - Archaeological Survey ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RFP <strong>for</strong> e-<strong>Ticketing</strong> <strong>Project</strong> Volume-III<br />

C Erroneous tickets<br />

reported<br />

D e-<strong>Ticketing</strong><br />

application service<br />

availability at DC<br />

and DR<br />

(Centralized) -<br />

Server Availability<br />

<strong>for</strong> Online Module<br />

The number of erroneous<br />

tickets reported by the visitors<br />

(including Foreigner and Indian<br />

visitors)<br />

The availability of all e-<br />

<strong>Ticketing</strong> application services<br />

at DC and DR should be<br />

greater than 99.982% in a<br />

quarter excluding the<br />

scheduled maintenance time.<br />

System should be able to print<br />

the Tickets and verify the tickets<br />

Analysis of event logs per<strong>for</strong>med.<br />

IA shall ensure that all relevant<br />

events are logged and such logs<br />

are made accessible to ASI<br />

appointed agency <strong>for</strong> review /<br />

report. End to end loop back<br />

mechanisms must be established<br />

<strong>for</strong> checking the availability of<br />

services. Non-availability of even<br />

one of the agreed services would<br />

amount to no service available<br />

<strong>for</strong> the purpose of this SLA and<br />

<strong>Archaeological</strong> <strong>Survey</strong> of India, Ministry of Culture Page 82 of 91<br />

Penalty –<br />

Slab 1: 0.5% of EQI<br />

Slab2: 1% of EQI<br />

Penalty – For each of the<br />

erroneous ticket reported to the<br />

system, the penalty shall be ten<br />

times of the ticket price. System<br />

should be able to record such<br />

instances<br />

Slab1: Application availability -<br />

99.00 % to 99.982%<br />

Slab 2: Application availability –<br />

99% to 97.00%<br />

Slab 3: Application availability<br />

below 97.00%<br />

Penalty – Slab 1: 1% of the EQI<br />

Slab 2: 5% of the EQI

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!