Kalwakruthy Stage-3-Lift Irrigation Scheme: This project involves the civil and hydro-mechanical works at<br />

Kalwakruthy for Stage-3 Irrigation Scheme. The scope of the project includes the construction of a gravity<br />

canal of six kilometers long, 19 meters wide and four meters deep, lifting underwater from Jonnaalaboguda<br />

Balancing reservoir, five pumps of 650 cusecs each and capacity of 30 MW and a trapezoisal shaped cistern<br />

of 30 meters wide and parallel sides of 45 meters and 62 meters long. This project commenced in<br />

September 2005 and is scheduled to be completed in November 2010. The contract value of this project<br />

approximately is Rs.6,752.00 million.<br />

Pranahita Chevala Irrigation Project: The project involves the investigation, design and execution of water<br />

conveyor system with capacity of 84.21 cumecs. We are also responsible for all related works, such as<br />

lined gravity canal cross-masonry and cross-drainage work, including an irrigation network of 25,000 acres<br />

for the Government of Andhra Pradesh Irrigation and CAD Department. This project commenced in March<br />

2009 and is scheduled to be completed in March 2013. The contract value of this project approximately is<br />

Rs.4,358.00 million.<br />

Industrial Structures and Buildings<br />

We undertake the construction of multi-storey buildings, residential, commercial and hospitality and other industrial<br />

structures. One of our major industrial structures and buildings projects currently undertaken is set forth below:<br />

NTPC Civil Works: This project involves the construction of the main plant and offsite civil works for NTPC<br />

Tamilnadu Energy Company Limited in its two 500 MW power project at Ennore near Chennai. This project<br />

commenced in February 2008 and is scheduled to be completed in September 2012. The contract value for this<br />

project approximately is Rs.2,860.00 million.<br />

Our Infrastructure Development Business<br />

GIPL was incorporated in 2001 and modeled as an infrastructure development company undertaking projects on a<br />

PPP basis. GIPL’s current portfolio of projects consists 18 projects in the roads, bridges, ports, hydroelectric power<br />

and biomass power sectors, of which, four are in the operations phase, 10 are in the development phase and four are<br />

in the pre-development phase. GIPL also offers services in other areas of project development, such as project<br />

advisory services, project funding and O&M activities. Further, GIPL also provides end-to-end supply chain<br />

solutions for the transportation of cargo through warehousing and distribution facilities.<br />

GIPL’s projects in the operations phase are as follows:<br />

Rajahmundry-Dharmavaram annuity road project, a 53 kilometer stretch of road in Andhra Pradesh on NH<br />

5, connecting Chennai and Kolkata, developed and maintained by an SPV, Rajahmundry Expressway<br />

Limited (“REL”).<br />

Dharmavaram-Tuni annuity road project, a 47 kilometer stretch of road in Andhra Pradesh on NH-5,<br />

connecting Chennai and Kolkata, developed and maintained by an SPV, Andhra Expressway Limited<br />

(“AEL”).<br />

New Mattancherry toll bridge project, a 700 meter bridge across the Mattancherry channel in Cochin,<br />

Kerala, developed and maintained by an SPV, Cochin Bridge Infrastructure Company Limited (“CBICL”).<br />

Visakhapatnam port project, two multipurpose berths at Visakhapatnam port, developed and maintained by<br />

an SPV, Vizag Seaport Private Limited (“VSPL”).<br />

A summary of each of the above projects is set out in the table below:<br />

Name of SPV REL AEL CBICL VSPL<br />

Nature of Project Road project Road project Bridge project 2 multipurpose<br />