28.01.2014 Views

Full page fax print - India Environment Portal

Full page fax print - India Environment Portal

Full page fax print - India Environment Portal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Planning<br />

2.1 Is the site properly identified (NP/WLS) and categorized (in terms of zonation) to achieve the<br />

objectives?<br />

Assessment criteria<br />

Condition Category* (Tick ü) Remarks<br />

Site not identified correctly or categorized. Poor<br />

After correctly identifying the site systematic<br />

Site identified correctly but not<br />

categorization with proper zones has been done.<br />

Fair<br />

categorized.<br />

Area where rights could not be purchased and<br />

Site identified correctly but not<br />

villagers could not be relocated has been<br />

Good<br />

systematically categorized.<br />

separately designated as Sainj Sanctuary. The<br />

Site identified correctly and systematically<br />

maximum biotic pressure on the NP was from<br />

categorized with proper zonation plans.<br />

western boundary side which has been<br />

Very good ü designated as eco development zone where<br />

necessary efforts are being done to contain the<br />

pressure.<br />

2.2 Does the site have a comprehensive Management Plan?<br />

Assessment criteria<br />

Condition Category* (Tick ü) Remarks<br />

No relevant Management Plan in place. Poor<br />

GHNP along with Tirthan and Sainj WLSs and<br />

Management Plan exist but not<br />

Ecodevelopment zone have comprehensive<br />

Fair<br />

comprehensive.<br />

management plans for each PA which have been<br />

Site has a comprehensive Management<br />

up dated recently on the basis of inputs got from<br />

Good<br />

Plan.<br />

World Bank aided conservation of biodiversity<br />

Site has a comprehensive, science based<br />

project and the experiences gained in<br />

Management Plan prepared through a Very good ü ecodevelopment process.<br />

participatory process.<br />

2.3 Is the Management Plan routinely and systematically updated?<br />

Assessment criteria<br />

Condition Category* (Tick ü) Remarks<br />

No process in place for systematic review<br />

The Management Plan has been updated<br />

Poor<br />

and update of Management Plan.<br />

recently with inputs from COB project and MP for<br />

Management Plan sometimes updated in<br />

all 3 PAs is now operative from 2005 to 2010.<br />

Fair<br />

adhoc manner.<br />

Management Plan routinely and<br />

systematically updated.<br />

Good<br />

Management Plan routinely,<br />

systematically and scientifically updated<br />

through a participatory process.<br />

Very good ü<br />

*Score: Poor: 2.5; Fair: 5; Good: 7.5; Very Good: 10<br />

Great Himalayan National Park (HP)<br />

51 |

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!