68 Interactive Control Charts Chapter 4<br />

Additional Example of Control Chart Builder<br />

At the end of phase 1, an adjustment was made to the manufacturing equipment. Therefore, the control<br />

limits for the entire series should not be used to assess the control during phase 2.<br />

To compute separate control limits for each phase:<br />

5. Add Phase to the Phase role.<br />

6. In the Average chart, right-click <strong>and</strong> select Warnings > Test Beyond Limits.<br />

Figure 4.6 Control Charts for each Phase<br />

Including the Phase variable means that the control limits for phase 2 are based only on the data for phase<br />

2. None of the phase 2 observations are outside the control limits. Therefore, you can conclude that the<br />

process is in control after the adjustments were made.