14.03.2014 Views

Quality and Reliability Methods - SAS

Quality and Reliability Methods - SAS

Quality and Reliability Methods - SAS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 5 Shewhart Control Charts 75<br />

Shewhart Control Charts for Variables<br />

Note: When sample sizes are unequal, the Test options are greyed out. If the samples change while the chart<br />

is open <strong>and</strong> they become equally sized, <strong>and</strong> the zone <strong>and</strong>/or test option is selected, the zones <strong>and</strong>/or tests will<br />

be applied immediately <strong>and</strong> appear on the chart.<br />

Control Limits for X - <strong>and</strong> S-Charts<br />

JMP generates control limits for X - <strong>and</strong> S-charts as follows.<br />

kσˆ<br />

LCL for X chart = X w – --------<br />

n i<br />

kσˆ<br />

UCL for X chart = X w + --------<br />

n i<br />

LCL for S-chart = maxc 4<br />

( n i<br />

)σˆ<br />

– kc 5<br />

( n i<br />

)σˆ<br />

, 0<br />

<br />

<br />

UCL for S-chart = c 4<br />

( n i<br />

)σ+<br />

kc 5<br />

( n i<br />

)σ<br />

Center line for S-chart: By default, the center line for the i th subgroup (where k is equal to the sigma<br />

multiplier) indicates an estimate of the expected value of s i . This value is computed as c ( 4<br />

n )σ σˆ<br />

i , where<br />

is an estimate of σ. If you specify a known value (σ 0 ) for σ, the central line indicates the value of<br />

c 4<br />

n i . Note that the central line varies with n i .<br />

( )σ 0<br />

The estimate for the st<strong>and</strong>ard deviation in an X<br />

/S chart is<br />

σˆ<br />

where<br />

=<br />

s 1<br />

s<br />

--------------- N<br />

+ … + ----------------<br />

c 4<br />

( n 1<br />

) c 4<br />

( n N<br />

)<br />

---------------------------------------------------<br />

N<br />

X w = weighted average of subgroup means<br />

σ = process st<strong>and</strong>ard deviation<br />

n i = sample size of i th subgroup<br />

c 4 (n) is the expected value of the st<strong>and</strong>ard deviation of n independent normally distributed variables<br />

with unit st<strong>and</strong>ard deviation<br />

c 5 (n) is the st<strong>and</strong>ard error of the st<strong>and</strong>ard deviation of n independent observations from a normal<br />

population with unit st<strong>and</strong>ard deviation<br />

N is the number of subgroups for whichn i<br />

≥ 2<br />

s i is the sample st<strong>and</strong>ard deviation of the i th subgroup

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!