01.04.2014 Views

Ideal Esprit HE Combi Boilers 24,30,35 User Guide - BHL.co.uk

Ideal Esprit HE Combi Boilers 24,30,35 User Guide - BHL.co.uk

Ideal Esprit HE Combi Boilers 24,30,35 User Guide - BHL.co.uk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION<br />

<strong>30</strong> PRESSURE RELIEF VALVE (PRV) OUTLET - (SAFETY VALVE DRAIN)<br />

The PRV outlet is located at the rear RHS of the boiler service <strong>co</strong>nnection area.<br />

Connection of additional pipewok to the PRV outlet should be made prior to <strong>co</strong>nnection of CH, DHW and gas <strong>co</strong>nnections<br />

for ease of access.<br />

The discharge pipe should be positioned so that the discharge of water or steam cannot create a hazard to the occupants<br />

of the premises or damage the electrical <strong>co</strong>mponents and wiring.<br />

31 WATER AND GAS CONNECTIONS<br />

Included in the hardware pack provided with the boiler are all the necessary isolation valves, seals and pipework to <strong>co</strong>nnect<br />

the CH, DHW and gas <strong>co</strong>nnections (refer to Frame 9). Components are also provided for an integral filling loop. Each<br />

<strong>co</strong>nnection is individually bagged with the <strong>co</strong>rrect seals and pipework, and should only be opened when required.<br />

1. Pre-assemble the filling loop between the CH return<br />

and DHW inlet isolation valves as shown in the photo.<br />

2. Attach this assembly to the bottom of the boiler using<br />

the sealing washers provided. The <strong>co</strong>pper tail pipes<br />

may now be <strong>co</strong>nnected to the valve outlets.<br />

3. Connect the gas service <strong>co</strong>ck using the washer<br />

provided. The <strong>co</strong>pper tail pipe may now be fitted.<br />

4. Connect the DHW outlet <strong>co</strong>nnection<br />

5. Connect the CH flow isolation valve using the washer<br />

provided. The <strong>co</strong>pper tail pipe may now be fitted.<br />

INSTALLATION<br />

WATER CONNECTIONS - CH<br />

Notes.<br />

For heating loads in excess of 60,000 Btu/h use 28mm x<br />

22mm <strong>co</strong>nnectors to <strong>co</strong>nnect the boiler flow and return pipes<br />

to 28mm system pipework.<br />

Do not subject any of the isolating valves to heat as the seals<br />

may be damaged.<br />

WATER CONNECTIONS - DHW<br />

Note. The DHW inlet isolating valve in<strong>co</strong>rporates a flow<br />

regulator and a CH filling loop <strong>co</strong>nnection.<br />

CH Flow<br />

Connection<br />

GAS CONNECTION<br />

IMPORTANT. The gas service <strong>co</strong>ck is sealed with a nonmetallic<br />

blue fibre washer so must not be overheated when<br />

making capillary <strong>co</strong>nnections.<br />

Refer to Frame 2 for details of the position of the gas <strong>co</strong>nnection.<br />

N.B. The principle of the 1:1 gas valve ensures that the<br />

<strong>Esprit</strong> <strong>HE</strong> range is able to deliver it’s full output at inlet<br />

pressures down to 14mb. However if dynamic pressures<br />

below 20mb are experienced ensure this is adequate for<br />

ALL other gas appliances in the property.<br />

A boiler gas supply pipe length of 20m and not less than<br />

15mm O.D. can be <strong>co</strong>nnected to the boiler via the gas<br />

service <strong>co</strong>ck union.<br />

Gas<br />

Connection<br />

DHW Outlet<br />

Connection<br />

DHW Inlet<br />

Connection<br />

CH Return<br />

Connection<br />

Inlet Pressure<br />

Test Point<br />

CH Filling<br />

Loop<br />

esp8826<br />

Filling Loop Valve<br />

(shown in closed postion)<br />

Flow<br />

Regulator<br />

Filling Loop Valve<br />

(shown in closed postion)<br />

<strong>Esprit</strong> - Installation and Servicing<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!