Mexico<br />

Environmental licences are needed in order to install facilities for the production<br />

of electricity <strong>and</strong> bioenergetics, as well as for the transportation <strong>and</strong> storage of natural<br />

gas, LP gas <strong>and</strong> bioenergetics, since environmental risks can arise from such activities.<br />

Environmental licences are commonly granted by local <strong>and</strong> federal authorities, depending<br />

on the activity to be carried out (construction or operation), <strong>and</strong> they are typically<br />

regarded as sensitive items to consider <strong>and</strong> deal with. As part of a legal due diligence, an<br />

environmental expert may have to address social issues with adjacent communities.<br />

At a federal level, such environmental licences may be environmental impact<br />

authorisations (whose application process lasts about 60 business days), risk authorisations<br />

(whose application process lasts about 45 business days), <strong>and</strong> air emissions permits,<br />

known in Mexico as ‘Comprehensive Environmental Licences’ (whose application<br />

process lasts about 30 business days). <strong>The</strong>se licences are requested from the Ministry of<br />

Environmental <strong>and</strong> Natural Resources. At the state or municipal levels of government,<br />

common approvals include l<strong>and</strong> use licences (or in the case of transmission lines or<br />

pipelines a route-tracing approval) <strong>and</strong> construction licence whose issuance time frames<br />

vary depending on the state or municipality, but are usually granted within one month<br />

of the application date.<br />

Finally, authorisations from the applicable governmental agency (municipal, state<br />

or federal) must be obtained if facilities for electricity production <strong>and</strong> the installation<br />

of trunk lines to transmit the electricity produced to the National Electric System (‘the<br />

SEN’), or the transportation of gas through pipelines is done via rivers, lakes, crossing<br />

l<strong>and</strong> or any l<strong>and</strong> of governmental ownership.<br />

iv Transfer of control <strong>and</strong> assignments<br />

To convey assets or for the assignment of permits for the production of electricity,<br />

transportation or distribution of natural gas, as well as for the merger <strong>and</strong> acquisition of<br />

companies developing such activities, the relevant authorities reviewing such transactions<br />

<strong>and</strong> authorising or rejecting the same, are the CRE <strong>and</strong>, if applicable, the COFECO.<br />

<strong>The</strong> Electric <strong>Energy</strong> Law states that when the ownership of private production<br />

energy facilities is sold, the permit for the production of energy can only be assigned to<br />

the new owner of the facilities, therefore the assignment of the facilities is always linked<br />

to the assignment of the production permit.<br />

For the assignment of the aforementioned permits <strong>and</strong> production facilities, an<br />

assignment application to the CRE is required. In the same way, legal, technical <strong>and</strong><br />

financial information of the assignee must be submitted. If the CRE considers that the<br />

information demonstrates the economic <strong>and</strong> technical capability of the assignee to carry<br />

out the production of energy, it will authorise the assignment within a month of the<br />

filing being made.<br />

In the case of assignment of the transportation, storage or distribution of natural<br />

gas permits, the procedure <strong>and</strong> period of analysis by the CRE of the assignment request is<br />

similar to the aforementioned, but there is no need to ask for a permit to assign facilities.<br />

Concerning the procedure for the assignment of the permit related to the<br />

transportation, storage or distribution of LP gas, the time frames <strong>and</strong> relevant authorities<br />

are different from the foregoing cases. If the permit is for the transportation of LP gas on<br />

tankers (ships or trucks), the permit assignment must be requested from the Ministry of<br />

183