Brazil<br />

In view of the specifics of the Brazilian electric power system the ONS takes into<br />

account the most appropriate power generators to be dispatched in view of eventual<br />

transmission restrictions or low volume of the reservoirs of hydroelectric plants. <strong>The</strong> cost<br />

of the dispatch of a different power plant is borne by all the agents as a charge of the<br />

electric system.<br />

Moreover, certain power generators are constantly adopting new technology to<br />

improve their efficiency, which increases their physical guarantee <strong>and</strong> consequently may<br />

allow for the sale of a greater volume of energy.<br />

iii Technological developments<br />

Besides the progress of the solar energy technology, <strong>and</strong> the competitiveness of wind power<br />

projects in Brazil, the use of methane thermal power plants are also being studied,which<br />

results from the l<strong>and</strong>fill <strong>and</strong> swine dejects, without economic destination. As a result,<br />

these projects may be part of an environmental solution against the methane pollution.<br />

VI<br />

THE YEAR IN REVIEW<br />

ANEEL has already confirmed that will perform at least two energy auctions in 2012.<br />

<strong>The</strong> first is expected to be held on 28 July. It will grant a three-year period for the<br />

construction of the plant (‘A-3’). For the A-3 auction, there are registered generation<br />

projects dealing with wind, gas thermal, biomass, PCHs <strong>and</strong> hydroelectric power plants.<br />

<strong>The</strong> second auction is expected to be held on 16 August, which will grant a fiveyear<br />

period for the construction of the plant (A-5). <strong>The</strong> term for the registration for this<br />

auction is not yet finished.<br />

It can be seen that ANEEL is maintaining its policy of promoting the expansion<br />

of Brazilian power capacity, an expansion requiring investment from the private sector<br />

in the new generation of power plants <strong>and</strong> transmission lines <strong>and</strong> serious long-term<br />

governmental planning.<br />

VII<br />

CONCLUSIONS <strong>and</strong> OUTLOOK<br />

In view of the current structure of the BPS, the government needs to continue to promote<br />

the expansion of the national power capacity in order to cope with the growing power<br />

dem<strong>and</strong>s of Brazilian industry <strong>and</strong> other power consumers.<br />

In this scenario, new investments will be required in next-generation plants <strong>and</strong> in<br />

transmission lines, to guarantee competitive power supplies at low costs, <strong>and</strong> delivering<br />

attractive opportunities for the private sector.<br />