4.4 Baseline emissions<br />

BE y , baseline emissions in year y (tCO 2 e), is estimated as follows:<br />

BE y<br />

= (MD Project,y<br />

– MD BL,y<br />

) • GWP CH4 + EF LFG,y<br />

• CEF elec,BL,y + ET LFG,y • CEF ther,BL,y<br />

(1) (2) (3) (4) (5) (6) (7)<br />

(1) MD project,y The amount of methane that would have been destroyed/combusted during the<br />

year (tCH 4 ) in project scenario<br />

Figure A-1 shows how MD project,y is to be determined ex post by metering the actual quantity of<br />

methane captured and destroyed once the project activity is operational.<br />

CH4<br />

Landfill<br />

LFGtotal,y<br />

(a) MDtotal,y<br />

LFGther,y<br />

LFGPL,y<br />

LFGelec,y<br />

LFGflare,y<br />

The lower of<br />

(a) or (b)<br />

should be<br />

chosen as<br />

MDproject,y<br />

Boiler Pipe Power Plant Flare<br />

MDther,y<br />

+ MDPL,y + MDelec,y + MDflared,y =<br />

(b) The sum<br />

: monitored : calculated<br />

Here, MD total,y , MD flared,y , MD elec,y , MD PL,y and MD ther,y are calculated based on monitored flow of landfill gas at<br />

different points, i.e. LFG total,y , LFG flare,y , LFG elec,y , LFG PL,y and LFG ther,y , using the following formula:<br />

MD total,y = LFG total,y • W CH4,y • D CH4<br />

MD elec,y = LFG elec,y • w CH4,y • D CH4<br />

MD ther,y = LFG ther,y • w CH4,y • D CH4<br />

MD PL,y = LFG PL,y • w CH4,y • D CH4<br />

MD flared,y = (LFG flare,y • w CH4,y • D CH4 ) – (PE flare,y /GWP CH4 )<br />

w CH4,y : Average methane fraction of the landfill gas as measured during the year (in m 3 CH 4 / m 3 LFG)<br />

D CH4 : Methane density (tCH 4 /m 3 CH 4 )<br />

PE flare,y : Project emissions from flaring of residual gas stream in year y (tCO 2 e). Determined by following<br />

the procedure described in the “Tool to determine project emissions from flaring gases containing<br />

Methane” [EB28, Annex 13].<br />

Figure A-1 Flow diagram of MD project,y calculation<br />

MD project,y should be chosen as the lower value of MD total,y or the sum of MD flared,y , MD elec,y , MD PL,y and<br />

MD ther,y . When the sum of MD flared,y , MD elec,y , MD PL,y and MD ther,y is lower, then the working hours of the<br />

energy plant(s) and the boiler(s) should be monitored and no emission reduction could be claimed<br />

for methane destruction in the energy plant or the boiler when they are not working.<br />

(2) MD BL,y The amount of methane that would have been destroyed/combusted during the year<br />

in the absence of the project (tCH 4 ) due to regulatory and/or contractual requirement<br />

(a) In the case where the MD BL,y is given/defined in the regulation and/or contract as a quantity<br />

that quantity will be used.<br />