For detailed procedural instructions for the clarifications and revisions of SSC methodologies and for<br />

submissions of proposed SSC methodologies, refer to the following documents on the “Procedures”<br />

page of the CDM website [http://cdm.unfccc.int/Reference/Procedures]:<br />

(a) Procedures for clarifications of SSC methodologies (Version 01) [EB34, Annex 6]<br />

(b) Procedures for revisions of SSC methodologies (Version 01) [EB34, Annex 7]<br />

(c) Procedures for the submission and consideration of a proposed new SSC methodology<br />

(Version 03) [EB40, Annex 2]<br />

2.2.6 Bundling of small scale CDM (SSC)<br />

(1) Overview of bundling<br />

Bundle is defined as bringing together of several SSC project activities to form a single CDM project<br />

activity or portfolio without the loss of distinctive characteristics of each project activity. Project<br />

activities within a bundle can be arranged in one or more sub-bundles, with each project activity<br />

retaining its distinctive characteristics. Such characteristics include its technology/measure, location,<br />

and application of simplified baseline methodology. Project activities within a sub-bundle belong to<br />

the same type. The sum of the output capacity of projects within a sub-bundle must not be more<br />

than the maximum output capacity limit for its type [CDM Glos. version 04, page 12]. For example,<br />

four fuel switching projects of the same type, same category and technology/measure each of<br />

which directly emit 10,000tCO 2 , 18,000tCO 2 , 9,000tCO 2 and 20,000tCO 2 equivalent per year could<br />

be bundled together for the purposes of CDM project registration, as long as separate monitoring<br />

plans are submitted for each one and the total capacity is within the maximum allowable limit of<br />

60,000tCO 2 equivalent per year (Figure 2-4).<br />

Concept of Project Bundling<br />

• The international CDM investor doesn’t invest in individual projects but in a<br />

project bundling organization (e.g. a fund) which deals with the single projects.<br />

• The project bundling organization collects projects and promotes the whole<br />

package to the Investor.<br />

Investor<br />

Project Bundling Organization<br />

Project 1 Project 2 Project 3 Project 4<br />

10,000 tCO2 18,000 tCO2<br />

9,000 tCO2 20,000 tCO2<br />

Total Capacity 57,000 tCO2 < Maximum Allowable Limit of 60,000 tCO2<br />

Figure 2-4 Concept of project bundling: Several similar projects are bundled together<br />