PDF File - GEC
PDF File - GEC
PDF File - GEC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CDM Project Activities ( for Emission Reductions)<br />
Large Scale CDM<br />
Small Scale CDM<br />
Approved<br />
Methodologies<br />
New<br />
Methodologies<br />
Approved Simplified<br />
Methodologies<br />
PDD<br />
EB’s approval of<br />
new methodologies<br />
SSC-PDD<br />
Validation<br />
Registration<br />
Figure 1-5 Approval process of CDM project activities and methodologies<br />
1.4.2 Start developing a CDM project activity<br />
(1) Applicability of approved methodologies<br />
Once a proposed new methodology (NM) is approved by the EB, it is reformatted and given a<br />
number as an approved methodology (e.g. AM0001). Upon request by the EB, the Meth Panel drafts<br />
consolidated methodologies based on proposed NMs and approved methodologies (AMs) with<br />
similar applicability. The lists of AMs and approved consolidated methodologies (ACMs) are regularly<br />
updated on the CDM website [http://cdm.unfccc.int/methodologies/PAmethodologies/approved.<br />
html]. The AMs and ACMs approved by the EB as of the results of EB43 (24 October 2008) are listed in<br />
Appendix 2. Project participants who wish to apply an approved methodology to their project activity<br />
must check the applicability conditions of AMs and ACMs. Project participants should be aware that<br />
the DOE will check the applicability of the selected approved methodology to the proposed project<br />
activity during the process of validation.<br />
(2) Proposal of a new baseline and monitoring methodology (NM)<br />
EB37 revised the procedures for submission and consideration of a proposed new methodology (NM)<br />
[EB37, Annex 3]. Figure 1-6 shows the procedures for proposing a NM. If project participants intend<br />
to propose a NM for consideration and approval by the EB, they should prepare the methodologies<br />
forms for NM along with a draft project design document (PDD) and as a minimum, complete<br />
sections A to C, including relevant annexes.<br />
A fee of USD 1,000 shall be charged to project participants when submitting a proposed NM for<br />
regular project activities (not applicable to methodologies for small scale and afforestation and<br />
reforestation project activities). If the proposed NM is approved and the project activity for which<br />
it was developed is registered, the registration fee shall be lowered by that amount. [EB37, Annex 3,<br />
para. 6]<br />
Project participants should select and contract a DOE/AE for submission of a NM. In case of a DOE,<br />
project participants should ensure that the DOE is accredited to perform validation of the sectoral<br />
scope of the proposed project activity (refer to section 1.3.3).<br />
9