29.10.2014 Views

PDF File - GEC

PDF File - GEC

PDF File - GEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CDM Project Activities ( for Emission Reductions)<br />

Large Scale CDM<br />

Small Scale CDM<br />

Approved<br />

Methodologies<br />

New<br />

Methodologies<br />

Approved Simplified<br />

Methodologies<br />

PDD<br />

EB’s approval of<br />

new methodologies<br />

SSC-PDD<br />

Validation<br />

Registration<br />

Figure 1-5 Approval process of CDM project activities and methodologies<br />

1.4.2 Start developing a CDM project activity<br />

(1) Applicability of approved methodologies<br />

Once a proposed new methodology (NM) is approved by the EB, it is reformatted and given a<br />

number as an approved methodology (e.g. AM0001). Upon request by the EB, the Meth Panel drafts<br />

consolidated methodologies based on proposed NMs and approved methodologies (AMs) with<br />

similar applicability. The lists of AMs and approved consolidated methodologies (ACMs) are regularly<br />

updated on the CDM website [http://cdm.unfccc.int/methodologies/PAmethodologies/approved.<br />

html]. The AMs and ACMs approved by the EB as of the results of EB43 (24 October 2008) are listed in<br />

Appendix 2. Project participants who wish to apply an approved methodology to their project activity<br />

must check the applicability conditions of AMs and ACMs. Project participants should be aware that<br />

the DOE will check the applicability of the selected approved methodology to the proposed project<br />

activity during the process of validation.<br />

(2) Proposal of a new baseline and monitoring methodology (NM)<br />

EB37 revised the procedures for submission and consideration of a proposed new methodology (NM)<br />

[EB37, Annex 3]. Figure 1-6 shows the procedures for proposing a NM. If project participants intend<br />

to propose a NM for consideration and approval by the EB, they should prepare the methodologies<br />

forms for NM along with a draft project design document (PDD) and as a minimum, complete<br />

sections A to C, including relevant annexes.<br />

A fee of USD 1,000 shall be charged to project participants when submitting a proposed NM for<br />

regular project activities (not applicable to methodologies for small scale and afforestation and<br />

reforestation project activities). If the proposed NM is approved and the project activity for which<br />

it was developed is registered, the registration fee shall be lowered by that amount. [EB37, Annex 3,<br />

para. 6]<br />

Project participants should select and contract a DOE/AE for submission of a NM. In case of a DOE,<br />

project participants should ensure that the DOE is accredited to perform validation of the sectoral<br />

scope of the proposed project activity (refer to section 1.3.3).<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!